Rejected Nodal Operating Guide Revision Requests (NOGRRs)
# Title Description Date Posted Sponsor Urgent Protocol Sections Current Status Effective Date(s)
NOGRR016 Nodal Operating Guides - Section 8 - Attachment I, Security, Facilities, and Connectivity Requirements of WAN Systems This Nodal Operating Guide Revision Request (NOGRR) proposes language for Section 8, Attachment I of the Nodal Operating Guides. 06/21/2007 OGRTF No 8, Attachment I Rejected
NOGRR017 Nodal Operating Guides - Section 8 - Attachment J, ERCOT Data Sets This Nodal Operating Guide Revision Request (NOGRR) proposes language for Section 8, Attachment J of the Nodal Operating Guides. 06/21/2007 OGRTF No 8, Attachment J Rejected
NOGRR024 System Security Response Group (SSRG) This Nodal Operating Guide Revision Request (NOGRR) adds requirements for the System Security Response Group (SSRG), which helps to satisfy the North American Electric Reliability Corporation (NERC) Standard CIP-001-1, Sabotage Reporting. 12/09/2008 ERCOT No 2.2.12 (New) Rejected
NOGRR075 Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI, which adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B. 05/19/2011 APX Power Markets No 4.5.3.3 Rejected
NOGRR095 Type 2 Special Protection System Submissions This NOGRR revises paragraph (13) of Section 6.2.2 to state that non-TSP equipment owners may submit Type 2 SPS proposals to ERCOT. 05/10/2012 Calpine Yes 6.2.2 Rejected
NOGRR149 Revision to Definition of Transmission Operator This Nodal Operating Guide Revision Reqeust (NOGRR) revises the definition of “Transmission Operator” to establish a “Bright Line” threshold (annual peak MW) below which a Distribution Service Provider (DSP) owning no transmission or generation facilities, and who is not provided or offered Transmission Operator (TO) services from their incumbent Transmission Service Provider (TSP) or wholesale power supplier, would be exempted from having to procure designated TO services from a third-party provider. The “Bright Line” threshold being recommended is 25 MW. 11/11/2015 SPPG No 1.4 Rejected
NOGRR152 Restore Synchrony Between Contingency Planning for Minimum Level of Responsive Reserve Service and Real Time Contingency Analysis Align consideration of the simultaneous loss of the South Texas Nuclear Project (STP) as a credible single contingency for purposes of determining the minimum amount of Responsive Reserve (RRS) as it is currently used in the Real-Time Contingency Analysis (RTCA). 01/06/2016 Apex CAES, LLC, Calpine Corporation, First Solar Inc., GDF Suez Energy Marketing North America Inc., Golden Spread Electric Cooperative, Lower Colorado River Authority, Luminant Energy Company LLC, South Texas Electric Cooperative, SunEdison Inc., SunPower Corporation, and Talen Energy No 2.3.1.1 Rejected
NOGRR184 Related to NPRR919, Exemption from Governor Primary Frequency Response Control for Certain Resources in Private Use Networks This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guide with changes proposed in Nodal Protocol Revision Request (NPRR) 919, Exemption from Governor Primary Frequency Response Control for Certain Resources in Private Use Networks, that allows a Resource in a Private Use Network whose primary function is providing steam to a host, and is not participating in the ERCOT energy market, to be exempted from Primary Frequency Response service requirements. The Governor will still be in service, but may be allowed to be in pressure control instead of Primary Frequency Response control. 01/18/2019 Formosa Utility Venture, Ltd No 2.2.7, 2.2.8 Rejected