- Home
- Market Rules
- Issues
NOGRR075
Summary
Title | Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI |
---|---|
Next Group | |
Next Step | |
Status | Rejected on 08/11/2011 |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
08/11/2011 | ROS | Rejected | |
07/20/2011 | OWG | Recommended for Rejection | ROS Consideration |
06/15/2011 | OWG | Deferred/Tabled | OWG Language Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
08/11/2011 | ROS | To reject NOGRR075 as recommended by OWG in the 7/20/11 OWG Report | Passed |
07/20/2011 | OWG | Consensus to recommend rejection of NOGRR075 | |
06/15/2011 | OWG | Consensus to table NOGRR075 for one month. | Passed |
Background
Status: | Rejected |
---|---|
Date Posted: | May 19, 2011 |
Sponsor: | APX Power Markets |
Urgent: | No |
Sections: | 4.5.3.3 |
Description: | This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI, which adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B. |
Reason: | To synchronize the Nodal Operating Guides with NPRR363. |
Key Documents
May 18, 2011 - doc - 82.5 KB
Jun 9, 2011 - doc - 40 KB
Jun 17, 2011 - doc - 89 KB
Jul 25, 2011 - doc - 89.5 KB
Aug 15, 2011 - doc - 91 KB