Nodal Protocol Revision Requests

This section contains nodal protocol revision requests (NPRRs) now in the approval process or already approved.

See NPRR Submission Process for access to revision request and comment forms.

Pending

Issue Title Next Group
NPRR956 Designation of Providers of Transmission Additions PRS
NPRR1070 Planning Criteria for GTC Exit Solutions PRS
NPRR1190 High Dispatch Limit Override Provision for Increased Load Serving Entity Costs BOARD
NPRR1202 Refundable Deposits for Large Load Interconnection Studies PRS
NPRR1214 Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk PRS
NPRR1226 Estimated Demand Response Data PRS
NPRR1229 Real-Time Constraint Management Plan Cost Recovery Payment PRS
NPRR1234 Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater TAC
NPRR1235 Dispatchable Reliability Reserve Service as a Stand-Alone Ancillary Service PRS
NPRR1238 Registration of Loads with Curtailable Load Capabilities PRS
NPRR1241 Firm Fuel Supply Service (FFSS) Availability and Hourly Standby Fee BOARD
NPRR1255 Introduction of Mitigation of ESRs PRS
NPRR1256 Settlement of MRA of ESRs TAC
NPRR1262 Ancillary Service Opt Out Clarification PRS
NPRR1263 Remove Accuracy Testing Requirements for CCVTs PRS
NPRR1264 Creation of a New Energy Attribute Certificate Program PRS
NPRR1265 Unregistered Distributed Generator PRS
NPRR1266 Opt-Out Status Held by a Transmission-Voltage Customer Cannot be Transferred PRS
NPRR1267 Large Load Interconnection Status Report PRS
NPRR1268 RTC – Modification of Ancillary Service Demand Curves TAC
NPRR1269 RTC+B Three Parameters Policy Issues TAC
NPRR1270 Additional Revisions Required for Implementation of RTC TAC
NPRR1271 Revision to User Security Administrator and Digital Certificates Opt-out Eligibility PRS
NPRR1272 Voltage Support at Private Use Networks PRS
NPRR1273 Appropriate Accounting for ESRs in PRC Calculation TAC
NPRR1274 RPG Estimated Capital Cost Thresholds of Proposed Transmission Projects PRS
NPRR1275 Expansion of Qualifying Pipeline Definition for Firm Fuel Supply Service in Phase 3 PRS
NPRR1276 Move OBD to Section 22 – Emergency Response Service Procurement Methodology PRS
NPRR1277 Revisions to EAL Formula PRS

Recently approved within the last 30 days

Issue Title Approved On
NPRR1261 Operational Flexibility for CRR Auction Transaction Limits 03/13/2025
NPRR1260 Corrections for CLR Requirements Inadvertently Removed 03/13/2025
NPRR1259 Update Section 15 Level Response Language 03/13/2025
NPRR1258 TSP Performance Monitoring Update 03/13/2025
NPRR1257 Limit on Amount of RRS a Resource can Provide Using Primary Frequency Response 03/13/2025
NPRR1253 Incorporate ESR Charging Load Information into ICCP 03/13/2025
NPRR1252 Pre-notice for Sharing of Some Information, Addition of Research and Innovation Partner, Clarifying Notice Requirements 03/13/2025
NPRR1251 Updated FFSS Fuel Replacement Costs Recovery Process 03/13/2025
NPRR1250 RPS Mandatory Program Termination 03/13/2025
NPRR1246 Energy Storage Resource Terminology Alignment for the Single-Model Era 03/13/2025
NPRR1243 Revision to Requirements for Notice and Release of Protected Information or ECEII to Certain Governmental Authorities 03/13/2025