Nodal Protocol Revision Requests
This section contains nodal protocol revision requests (NPRRs) now in the approval process or already approved.
See NPRR Submission Process for access to revision request and comment forms.
Pending
Issue | Title | Next Group |
---|---|---|
NPRR956 | Designation of Providers of Transmission Additions | PRS |
NPRR1070 | Planning Criteria for GTC Exit Solutions | PRS |
NPRR1190 | High Dispatch Limit Override Provision for Increased Load Serving Entity Costs | PUCT |
NPRR1202 | Refundable Deposits for Large Load Interconnection Studies | PRS |
NPRR1214 | Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk | PRS |
NPRR1226 | Estimated Demand Response Data | PRS |
NPRR1229 | Real-Time Constraint Management Plan Cost Recovery Payment | TAC |
NPRR1234 | Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater | PUCT |
NPRR1235 | Dispatchable Reliability Reserve Service as a Stand-Alone Ancillary Service | PRS |
NPRR1238 | Registration of Loads with Curtailable Load Capabilities | PRS |
NPRR1241 | Firm Fuel Supply Service (FFSS) Availability and Hourly Standby Fee | PUCT |
NPRR1255 | Introduction of Mitigation of ESRs | PRS |
NPRR1256 | Settlement of MRA of ESRs | PUCT |
NPRR1263 | Remove Accuracy Testing Requirements for CCVTs | PRS |
NPRR1264 | Creation of a New Energy Attribute Certificate Program | PRS |
NPRR1265 | Unregistered Distributed Generator | PRS |
NPRR1266 | Opt-Out Status Held by a Transmission-Voltage Customer Cannot be Transferred | PRS |
NPRR1267 | Large Load Interconnection Status Report | PRS |
NPRR1268 | RTC – Modification of Ancillary Service Demand Curves | PUCT |
NPRR1269 | RTC+B Three Parameters Policy Issues | PUCT |
NPRR1270 | Additional Revisions Required for Implementation of RTC | PUCT |
NPRR1271 | Revision to User Security Administrator and Digital Certificates Opt-out Eligibility | TAC |
NPRR1272 | Voltage Support at Private Use Networks | PRS |
NPRR1273 | Appropriate Accounting for ESRs in PRC Calculation | PUCT |
NPRR1274 | RPG Estimated Capital Cost Thresholds of Proposed Transmission Projects | PRS |
NPRR1275 | Expansion of Qualifying Pipeline Definition for Firm Fuel Supply Service in Phase 3 | PRS |
NPRR1276 | Move OBD to Section 22 – Emergency Response Service Procurement Methodology | PRS |
NPRR1277 | Revisions to EAL Formula | PRS |
NPRR1278 | Establishing Advanced Grid Support Service as an Ancillary Service | PRS |
NPRR1279 | Reinstate Enhancements to the Exceptional Fuel Cost Process | PRS |
Recently approved within the last 30 days
There are no recently approved revision request.