Issue Title Next Group
NPRR956 Designation of Providers of Transmission Additions PRS
NPRR1070 Planning Criteria for GTC Exit Solutions PRS
NPRR1180 Inclusion of Forecasted Load in Planning Analyses TAC
NPRR1188 Implement Nodal Dispatch and Energy Settlement for Controllable Load Resources PUCT
NPRR1190 High Dispatch Limit Override Provision for Increased Load Serving Entity Costs TAC
NPRR1200 Utilization of Calculated Values for Non-WSL for ESRs PRS
NPRR1202 Refundable Deposits for Large Load Interconnection Studies PRS
NPRR1214 Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk PRS
NPRR1215 Clarifications to the Day-Ahead Market (DAM) Energy-Only Offer Calculation PUCT
NPRR1221 Related to NOGRR262, Provisions for Operator Controlled Manual Load Shed PUCT
NPRR1226 Demand Response Monitor PRS
NPRR1227 Related to RMGRR181, Alignment of Defined Term Usage and Resolution of Inconsistencies PUCT
NPRR1229 Real-Time Constraint Management Plan Energy Payment PRS
NPRR1234 Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater PRS
NPRR1235 Dispatchable Reliability Reserve Service as a Stand-Alone Ancillary Service PRS
NPRR1236 RTC+B Modifications to RUC Capacity Short Calculations PUCT
NPRR1237 Retail Market Qualification Testing Requirements PUCT
NPRR1238 Voluntary Registration of Loads with Curtailable Load Capabilities PRS
NPRR1239 Access to Market Information TAC
NPRR1240 Access to Transmission Planning Information TAC
NPRR1241 Firm Fuel Supply Service (FFSS) Availability and Hourly Standby Fee PRS
NPRR1243 Revision to Requirements for Notice and Release of Protected Information or ECEII to Certain Governmental Authorities PRS
NPRR1244 Clarification of Controllable Load Resource Primary Frequency Response Responsibilities PUCT
NPRR1245 Additional Clarifying Revisions to Real-Time Co-Optimization BOARD
NPRR1246 Energy Storage Resource Terminology Alignment for the Single-Model Era BOARD
NPRR1247 Incorporation of Congestion Cost Savings Test in Economic Evaluation of Transmission Projects TAC
NPRR1248 Correction to NPRR1197, Optional Exclusion of Load from Netting at EPS Metering Facilities which Include Resources BOARD
NPRR1249 Publication of Shift Factors for All Active Transmission Constraints in the RTM BOARD
NPRR1250 RPS Mandatory Program Termination PRS
NPRR1251 Updated FFSS Fuel Replacement Costs Recovery Process PRS
NPRR1252 Pre-notice for Sharing of Some Information, Addition of Research and Innovation Partner, Clarifying Notice Requirements PRS
NPRR1253 Incorporate ESR Charging Load Information into ICCP PRS
NPRR1254 Modeling Deadline for Initial Submission of Resource Registration Data TAC
NPRR1255 Introduction of Mitigation of ESRs PRS
NPRR1256 Settlement of MRA of ESRs PRS
NPRR1257 Limit on Amount of RRS a Resource can Provide Using Primary Frequency Response PRS
NPRR1258 TSP Performance Monitoring Update PRS
NPRR1259 Update Section 15 Level Response Language PRS
NPRR1260 Corrections for CLR Requirements Inadvertently Removed PRS
NPRR1261 Operational Flexibility for CRR Auction Transaction Limits PRS
NPRR1262 Ancillary Service Opt Out Clarification PRS