717 |
V3.0 added a duplicate YNQ~~Y~~~~~~9~RES segment to the 65002. |
V3.0 added a duplicate YNQ~~Y~~~~~~9~RES segment to the 65002. |
01/10/2008 |
Suzette Sondag |
EC Power |
No |
650_02 |
Withdrawn |
3.0A |
No |
735 |
In order to support Meter Tampering, in the event of a Mass Transition, the POLR CR will be notified that an ESI ID had a Switch Hold Prior to the Mass Transition. |
In order to support Meter Tampering, in the event of a Mass Transition, the POLR CR will be notified that an ESI ID had a Switch Hold Prior to the Mass Transition. |
06/28/2010 |
Kathy Scott |
CenterPoint Energy |
No |
814_04 and 814_14 |
Withdrawn |
4.0 |
No |
737 |
In order to support the Meter Tampering Rulemaking, changes were added to the 650_01 and 650_02 to communicate Switch Hold Disconnect and Reconnect |
In order to support the Meter Tampering Rulemaking, changes were added to the 650_01 and 650_02 to communicate Switch Hold Disconnect and Reconnect |
06/28/2010 |
Kathy Scott |
CenterPoint Energy |
No |
650_01 and 650_02 |
Withdrawn |
4.0 |
No |
738 |
New Critical Care status designations are required when Critical Care = Y and additional Contact information is required for certain Critical Care status. |
PUCT Project 37622 "RULEMAKING TO AMEND CUSTOMER PROTECTION RULES RELATING TO DESIGNATION OF CRITICAL CARE CUSTOMERS" proposes new Critical Care Status designations that add new identification requirements to all affected TX SET Implementation Guides. |
06/28/2010 |
Kathy Scott |
CenterPoint Energy |
No |
814_04, 814_05, 814_14, 814_22 |
Withdrawn |
4.0 |
No |
741 |
Adding a priority code to the 814_24 to allow for same day requests to be processed at a different level from standard Move Outs. |
Adding a priority code to the 814_24 to allow for same day requests to be processed at a different level from standard Move Outs. |
08/11/2010 |
Jennifer Frederick |
Direct Energy |
No |
814_03 and 814_24 |
Withdrawn |
4.0 |
Yes |
744 |
Adding a Time Stamp to the BGN to assist in establishing what time the CR submitted the service request to the TDSP. |
Adding a Time Stamp to the BGN to assist in establishing what time the CR submitted the service request to the TDSP. |
08/18/2010 |
Jennifer Frederick |
Direct Energy |
No |
650_01 |
Withdrawn |
Future |
No |
757 |
Missed 814_20 transaction left out on CC 738 - New Critical Care status designations are required when Critical Care = Y and additional Contact information is required for certain Critical Care status. |
Missed 814_20 transaction left out on CC 738 - New Critical Care status designations are required when Critical Care = Y and additional Contact information is required for certain Critical Care status |
10/18/2010 |
Diana Rehfeldt |
TNMP |
No |
814_20 |
Withdrawn |
4.0 |
No |
758 |
Proposes changes to MIMO rules (Solution to Stacking), which would allow the TDSP to reject an 814_08 cancel with cancel codes of A81, MPC and MOX |
Proposes changes to MIMO rules (Solution to Stacking), which would allow the TDSP to reject an 814_08 cancel with cancel codes of A81, MPC and MOX |
10/19/2010 |
Jane Eyanson |
AEP |
No |
814_08 and 814_09 |
Withdrawn |
4.0 |
Yes |
763 |
Ability to allow the MVI to be suspended when the ESIID has a Switch Hold applied for Meter Tampering or Defer Payment agreement. |
Ability to allow the MVI to be suspended when the ESIID has a Switch Hold applied for Meter Tampering or Defer Payment agreement. |
10/25/2010 |
Johnny Robertson |
TXU Energy |
Yes |
814_28 |
Withdrawn |
Future |
Yes |
764 |
Add an expiration date to the Special Needs designation to allow CRs to audit these designations and ask TDSPs for clarification of whether a status has been removed if the expiration date has passed without receiving an update. |
Add an expiration date to the Special Needs designation to allow CRs to audit these designations and ask TDSPs for clarification of whether a status has been removed if the expiration date has passed without receiving an update. |
10/27/2010 |
Jennifer Fredrick |
Direct Energy |
No |
814_04, 814_05, 814_14, 814_20 and 814_22 |
Withdrawn |
4.0 |
No |
765 |
The final rule language for Critical Care adopted the concept that TDSPs are required to provide notice to REPs when a Customer's ESIID is placed on Temporary Status for either Critical Care Residential or Chronic Care Residential. Adding 2... |
The final rule language for Critical Care adopted the concept that TDSPs are required to provide notice to REPs when a Customer's ESIID is placed on Temporary Status for either Critical Care Residential or Chronic Care Residential. Adding 2 additional codes for the temporary Critical Care status |
11/01/2010 |
Ed Echols |
Oncor |
No |
814_04, 814_05, 814_14, 814_20 and 814_22 |
Withdrawn |
4.0 |
No |
767 |
In order to accommodate the reason for change when updating the expiration date for special needs customers add the REF02 code of the DTM036 to the REF~TD of the LIN loop. |
In order to accommodate the reason for change when updating the expiration date for special needs customers add the REF02 code of the DTM036 to the REF~TD of the LIN loop. |
11/01/2010 |
Diana Rehfeldt |
Texas-New Mexico Power |
No |
814_20 |
Withdrawn |
4.0 |
No |
768 |
Adding clarifying language into the gray box for Change Control 2010-735 |
This change control is adding clarifying language into the gray box that was approved in Change Control 2010-735 by TX SET on 10/12/10 to know which Switch Hold is required to be notified to the gaining POLR CR in the event of a Mass Transition according to the Tampering Rule |
11/19/2010 |
Kathy Scott |
CenterPoint Energy |
No |
814_04 and 814_14 |
Withdrawn |
4.0 |
No |
769 |
Adding clarifying language to the Switch Hold Add & Swith Hold Remove codes for Change Control 2010-737. |
Adding clarifying language to the Switch Hold Add & Swith Hold Remove codes for Change Control 2010-737. |
11/19/2010 |
Kathy Scott |
CenterPoint Energy |
No |
650_01 and 650_02 |
Withdrawn |
4.0 |
No |
773 |
Clarifications to bring the TX SET Implementation Guides compliant and resolve disparities between Change Control 2010-738 and PUCT Critical Care Form. |
Clarifications to bring the TX SET Implementation Guides compliant and resolve disparities between Change Control 2010-738 and PUCT Critical Care Form. |
01/24/2011 |
Kathy Scott |
CenterPoint Energy |
No |
814_04, 814_05, 814_14, 814_22 |
Withdrawn |
4.0 |
No |
774 |
Changes were made to the Critical Care form by the PUCT and subsequently changes are required to Change Control 2010-757 to update the telephone numbers to be non-specific. |
Changes were made to the Critical Care form by the PUCT and subsequently changes are required to Change Control 2010-757 to update the telephone numbers to be non-specific. |
01/24/2011 |
Diana Rehfeldt |
Texas-New Mexico Power |
No |
814_20 |
Withdrawn |
4.0 |
No |
792 |
Update the 814_20 guide for Critical Care to no longer require the entire loop to be present when adding or updating Emergency Contact Information |
Changes made to the gray boxes in the guide regarding when and how Critical Care contact information is sent creates a possible reject situation if all the contact information segments are not included. |
09/26/2011 |
Diana Rehfeldt |
TNMP |
No |
814_20 |
Withdrawn |
|
No |
800 |
Muni-Coop guidelines are different than the IOU guidelines for meter removal |
When the Muni-Coop issues a 650_04 they pull the meter for a non-pay disconnect. The Muni-Coop will use the S2 action code in the BGN08. The CR's are wanting the Muni-Coop to use the R8 action code so that the CRs system will automatically trigger an 814_24. The Muni-Coop is disconnecting for non-pay and not because the customer called for disconnect, in which case the R8 action code is used. The Muni-Coop would like the CR's to understand that the guidelines are different for Muni-Coops than the IOU guidelines. Recommend adding the following to the S2 gray box "Required for MOU/EC: In order to avoid ongoing liability, a CR must submit an 814_24 to terminate service no earlier than five days after receipt of a 650_04 indicating successful completion of the disconnect for non-payment request." To clarify the use of S2 action code in MOU-EC market. |
08/22/2013 |
Paula Shadle |
Nueces Electric Coop |
No |
650_04 |
Withdrawn |
|
Yes |
805 |
Update all of the TX SET Implementation Guides to allow the receiver of the transaction containing Special Characters to determine to either accept the transaction or to respond with a valid rejection. |
Update the all TX SET Implementation Guides to allow the receiver of the transaction containing Special Characters to determine to either accept the transaction or to respond with a valid rejection. The structure page of every Implementation Guide will be updated to have the following language. Transaction Set Notes: For use on an alphanumeric field, TX SET recognizes all characters within the Basic Character Set. Within the Extended Character Set, TX SET recognizes all character sets except all Select Language Characters found in Section 3.3.2 item (4) of X12 Application Control Structure. Exceptions to ANSI Standards for alphanumeric fields are noted in gray box of this Implementation Guide. Recipients of a transaction(s) containing characters found in item (4) as referenced above may make the determination to accept the transaction(s) or respond with a valid reject. |
01/09/2017 |
Kathryn Thurman |
ERCOT |
No |
All transactions |
Withdrawn |
|
No |