Other Binding Documents Revision Requests (OBDRRs)
# Title Description Date Posted Sponsor Urgent Protocol Sections Current Status Effective Date(s)
OBDRR001 Texas SET Implementation Guides Revision Process This Other Binding Document Revision Request (OBDRR) incorporates the revision process into the Texas Standard Electronic Transaction Implementation Guides. 12/13/2010 Jennifer Frederick on behalf of Texas SET Working Group Yes Revision Process (new) Approved
01/18/2011
OBDRR002 ORDC OBD Revisions for PUCT Project 47199 This Other Binding Document Revision Request (OBDRR) revises the On-Line and Off-Line capacity reserves for Resources On-Line during a Reliability Unit Commitment (RUC) instruction. 03/12/2018 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
05/31/2018
OBDRR003 Change Validation Rules to Preclude Certain Transactions at Resource Nodes within Private Use Networks This Other Binding Document Revision Request (OBDRR) aligns the “Procedure for Identifying Resource Nodes” with changes implemented by System Change Request (SCR) 796, Change Validation Rules to Preclude Certain Transactions at Resource Nodes Within Private Use Networks. Also, this OBDRR permits ERCOT to secure transmission equipment in the Day-Ahead Market (DAM) as necessary to allow the application to reach a solution, in the interim before implementation of SCR796. 03/28/2018 ERCOT No Procedure for Identifying Resource Nodes Approved
08/09/2019
OBDRR004 Updates to Emergency Response Service Procurement Methodology This Other Binding Document Revision Request (OBDRR) revises the risk-weighting factors available for ERCOT to assign to each ERS Time Period in Section E, ERS Expenditure Limit; describes the process for updating the ERS Time Period Expenditure Limits for any subsequent Standard Contract Terms if money is needed to fund and ERS renewal Contract Period; and updates Table A in Section F, Capacity Inflection Point, to reflect the proposed changes to the risk-weighting factors. 04/03/2018 ERCOT No Emergency Response Service Procurement Methodology Approved
07/01/2018
OBDRR005 Change to the Generic Maximum Shadow Price for Base Case Transmission Constraints This Other Binding Document Revision Request (OBDRR) revises the Generic Transmission Constraint (GTC) Shadow Price cap that is used in Security Constrained Economic Dispatch (SCED) for base case constraints from $5,000/MWh to $9,251/MWh. Base case transmission constraints include GTCs. This revision also updates the associated examples in Section 3.5, Generic Values for the Transmission Network System-Wide Shadow Price Caps in SCED, and makes an administrative edit to a Protocol reference. 05/10/2018 ERCOT No Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints Approved
06/20/2018
OBDRR006 Alignment of ORDC OBD with NPRR884, Adjustments to Pricing and Settlement for Reliability Unit Commitments (RUCs) of On-Line Combined Cycle Generation Resources This Other Binding Document Revision Request (OBDRR) aligns language with Protocol changes made by Nodal Protocol Revision Request (NPRR) 884, Adjustments to Pricing and Settlement for Reliability Unit Commitments (RUCs) of On-Line Combined Cycle Generation Resources. 07/02/2018 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR007 Revisions to the ORDC Methodology to Include Photo-Voltaic Generation Resources (PVGRs) Since it was implemented in June 2014, the Operating Reserve Demand Curve (ORDC) methodology specifically excludes curtailed Photo-Voltaic Generation Resources (PVGRs) in the determination of the ORDC price adders. Since that time, substantial MWs of PVGRs have been installed in ERCOT, a considerable amount of which is being curtailed on a regular basis. This Other Binding Document Revision Request (OBDRR) changes the methodology to consider the additional capacity. 08/01/2018 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
10/18/2019
OBDRR008 Correction to Calculation of Real-Time LMPs at Logical Resource Node for On-Line Combined Cycle Generation Resources This Other Binding Document Revision Request (OBDRR) aligns the “Procedure for Identifying Resource Nodes” with changes implemented by Nodal Protocol Revision Request (NPRR) 890, Correction to Calculation of Real-Time LMPs at Logical Resource Node for On-Line Combined Cycle Generation Resources. 08/15/2018 ERCOT No Procedure for Identifying Resource Nodes Approved
10/10/2018
OBDRR009 ORDC OBD Revisions for ERCOT-Directed Actions Related to DC Ties This Other Binding Document Revision Request (OBDRR) revises the On-Line and Off-Line capacity reserves for ERCOT out-of-market actions related to Direct Current Ties (DC Ties). 10/19/2018 Rainbow Energy Marketing Corporation No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR010 Related to NPRR910, Clarify Treatment of RUC Resource that has a Day-Ahead Market Three-Part Supply Award This Other Binding Document Revision Request (OBDRR) codifies that for a Resource that has been Awarded a Three-Part Supply Offer in the Day-Ahead Market (DAM) but decides not to operate the Resource in the Real-Time Market (RTM) and subsequently receives a Reliability Unit Commitment (RUC) instruction to operate, that Resource’s High Sustained Limit (HSL) will continue to be included in the On-Line capacity considered in Operating Reserve Demand Curve (ORDC) pricing. 11/28/2018 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR011 ORDC OBD Revisions for PUCT Project 48551 As directed by the Commissioners of the Public Utility Commission of Texas (PUCT) at the PUCT’s January 17, 2019 open meeting, this Other Binding Document Revision Request (OBDRR) modifies the ORDC to achieve a rightward shift in the Loss of Load Probability (LOLP) curve by 0.25 standard deviations in 2019 and another 0.25 standard deviations in 2020. To effectuate this change, this OBDRR revises the methodology for calculating the probability of reserves falling below the minimum contingency level (“PMBCL”) to shift the LOLP by a defined factor “S” multiplied by the standard deviation of the LOLP distribution. This OBDRR proposes to grey-box the change for 2020 until March 1, 2020, consistent with the Commissioners’ directive. With respect to determining the PMBCL and Real-Time Reserve Price Adders, this OBDRR also replaces season and time of day blocks with a blended curve for all seasons and hours, consistent with the Commissioners’ instruction. 01/22/2019 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR012 Texas Market Test Plan Updates This Other Binding Document Revision Request (OBDRR) updates the Texas Market Test Plan (TMTP) to reflect changes necessitated by the upcoming implementation of ERCOT’s new automated flight testing system. In addition, other cleanups are made to the document. 03/08/2019 ERCOT No Texas Market Test Plan Approved
05/08/2019
OBDRR013 Change to the Voltage Levels of Generic Transmission Shadow Prices Caps This Other Binding Document Revision Request (OBDRR) revises the voltage levels used to define Generic Transmission Shadow Price Caps for N-1 Constraint Violations in Section 3.5, Generic Values for the Transmission Network System-Wide Shadow Price Caps in SCED. The current, single-value categories of 345 kV, 138 kV, and 69 kV are changed to kV ranges to accommodate transmission equipment that would not directly fall into the three existing categories. 04/01/2019 ERCOT No Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints Approved
06/12/2019
OBDRR014 Change Posting Location for Non-biddable Resource Nodes This Other Binding Document Revision Request (OBDRR) changes the location in which the list of Resource Nodes where Energy Only Offers, Energy Bids, and Point-to-Point (PTP) bids are disallowed will be posted, and clarifies that the Congestion Revenue Right (CRR) team will use the most recent list when building the auction model. This OBDRR also modifies the approval process for this Other Binding Document to better account for revisions that may require a project to implement, and would otherwise require a separate System Change Request (SCR) under the current approval process. 05/09/2019 ERCOT No Procedure for Identifying Resource Nodes Approved
05/23/2019
OBDRR015 Linking of VOLL to the Effective SWCAP This Other Binding Document Revision Request (OBDRR) modifies the Value of Lost Load (VOLL) to be set equal to the System-Wide Offer Cap (SWCAP). This would result in VOLL changing from the High System-Wide Offer Cap (HCAP) to the Low System-Wide Offer Cap (LCAP) should the Peaker Net Margin (PNM) exceed the PNM threshold within an annual Resource adequacy cycle. 05/15/2019 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
06/12/2019
OBDRR016 Updates to the Texas Market Test Plan (TMTP) This Other Binding Document Revision Request (OBDRR) updates the language in the TMTP to reflect various changes including but not limited to the removal of references to an ad hoc period and add references to “out-of-flight” testing. Other changes include moving testing of existing Competitive Retailer (CR) bank changes and established Market Interface Service Provider (MISP) changes to testing outside of regular test flights. This change also updates language for consistency in terminology. 08/27/2019 Texas SET WG No Texas Market Test Plan (TMTP) Approved
OBDRR017 Related to NPRR987, BESTF-3 Energy Storage Resource Contribution to Physical Responsive Capability and Real-Time On-Line Reserve Capacity Calculations This Other Binding Document Revision Request (OBDRR) aligns language within the Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder with Protocol revisions under NPRR987, and changes the Real-Time operating reserve calculation to consider the state of charge of the Energy Storage Resource (ESR) when calculating the contribution those Resources make to the On-Line operating reserves. 12/09/2019 ERCOT Yes Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR018 Related to NPRR1003, Elimination of References to Resource Asset Registration Form – Procedure for Identifying Resource Nodes This Other Binding Document Revision Request (OBDRR) aligns the Procedure for Identifying Resource Nodes with changes proposed in NPRR1003, by replacing all remaining references to the Resource Asset Registration Form (“RARF”) with more general language in anticipation of the elimination of the RARF. 02/26/2020 ERCOT No Procedure for Identifying Resource Nodes Approved
OBDRR019 Related to NPRR1003, Elimination of References to Resource Asset Registration Form – Requirements for Aggregate Load Resource Participation in the ERCOT Markets This Other Binding Document Revision Request (OBDRR) aligns the Requirements for Aggregate Load Resource Participation in the ERCOT Markets with changes proposed in NPRR1003, by replacing all remaining references to the Resource Asset Registration Form (“RARF”) with more general language in anticipation of the elimination of the RARF. This OBDRR also updates this document’s change control process for consistency with similar Other Binding Documents. 02/26/2020 ERCOT No Requirements for Aggregate Load Resource Participation in the ERCOT Markets Approved
OBDRR020 RTC – Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints This Other Binding Document Revision Request (OBDRR) updates the Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints to address changes associated with the implementation of RTC. 03/25/2020 ERCOT Yes Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints Approved
OBDRR021 Correction to Calculation in Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources This Other Binding Document Revision Request (OBDRR) aligns the language in the Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources with the Protocols following Phase 1 implementation of Nodal Protocol Revision Request (NPRR) 863, Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve, and corrects inadvertent errors in the formulae for calculating droop performance to determine Responsive Reserve (RRS) limits. The Performance, Disturbance, Compliance Working Group (PDCWG) reviewed these updates at their April 15, 2020 WebEx-only meeting. Listed below is a summary of the modifications that are being proposed by this OBDRR: a) Recognize that any Generation Resource capable of operating in synchronous condenser fast-response mode can provide RRS; b) Clarify RRS limits applicable to Resources providing RRS as Fast Frequency Response (FFR); and c) Correct inadvertent errors in the formulae for calculating droop performance to determine RRS limits. 05/06/2020 NRG No Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources Approved
08/01/2020
OBDRR022 Updates to Demand Response Data Definitions and Technical Specifications Following NPRR933 Approval This Other Binding Document Revision Request (OBDRR) incorporates minor edits to the initial Other Binding Document (OBD), Demand Response Data Definitions and Technical Specifications, that was approved by the ERCOT Board in conjunction with Nodal Protocol Revision Request (NPRR) 933, Reporting of Demand Response by Retail Electric Providers and Non-Opt-In Entities. 07/01/2020 ERCOT No Demand Response Data Definitions and Technical Specifications Approved
OBDRR023 Related to NPRR984, Change ERS Standard Contract Terms This Other Binding Document Revision Request (OBDRR) aligns the Emergency Response Service Procurement Methodology with changes proposed in NPRR984. 08/05/2020 ERCOT No Emergency Response Service Procurement Methodology Approved
02/01/2021
OBDRR024 Including Load Resource ECRS Capacity in On-Line Reserve This Other Binding Document Revision Request (OBDRR) aligns the calculation of reserve price adders with the revisions that will be implemented with Phase 2 of Nodal Protocol Revision Request (NPRR) 863, Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve. 08/11/2020 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Withdrawn
OBDRR025 Clarification for the RRS Limit on Individual Non-Thermal Generation Resources This Other Binding Document Revision Request (OBDRR) clarifies that Responsive Reserve (RRS) limit for individual non-thermal Generation Resources will be limited to 125 MW. This value may be updated in the future if it creates any reliability issues or as more operational data and models for such Resources become available. The Performance, Disturbance, Compliance Working Group (PDCWG) reviewed these updates at their September 8, 2020 WebEx-only open meeting. 10/02/2020 NRG No Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources Withdrawn
OBDRR026 Change Shadow Price Caps to Curves and Remove Shift Factor Threshold This Other Binding Document Revision Request (OBDRR) makes certain congestion management changes for contingency constraints. No base case or Generic Transmission Constraint (GTC) pricing is affected by this OBDRR. This OBDRR 1) Changes the default Shadow Price caps to curves. The change lowers the value for small violations and raises the value for large violations; and 2) Removes the Shift Factor threshold as a factor for determining eligibility for Security-Constrained Economic Dispatch (SCED) consideration. Currently, a constraint is only eligible for resolution by SCED if at least one Resource exists that has a Shift Factor of greater than 2% or less than negative 2%. This OBDRR also proposes minor cleanup items and simplifications to Section 3, Elements for Methodology for Setting the Network Transmission System-Wide Shadow Price Caps. 01/21/2021 Independent Market Monitor (IMM) No Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints Withdrawn
OBDRR027 Clarify Implementation Timeline for OBDRR023 This OBDRR clarifies the implementation timeline for OBDRR023. As originally approved, the effective date for OBDRR023 was stated as “February 1, 2021 and upon system implementation of NPRR984.” NPRR984 will be implemented on October 1, 2021; accordingly, the effective date stated in OBDRR023 lacked clarity as it referenced two different dates. This clarifies that OBDRR023 will be implemented over two separate dates: a partial implementation on February 1, 2021, and implementation of the remaining language on October 1, 2021. Additionally, this OBDRR further clarifies that the footnote added by OBDRR023 in Section E, ERS Expenditure Limit, which is applicable only to the 2021 Emergency Reserve Service (ERS) budget year, will be deleted as of December 1, 2021, the start of the 2022 ERS budget year. 02/02/2021 ERCOT No Emergency Response Service Procurement Methodology Approved
04/16/2021
OBDRR028 Related to NPRR1069, Align Ancillary Service Responsibility for ESRs with NPRR987 This Other Binding Document Revision Request (OBDRR) clarifies Operating Reserve treatment of Energy Storage Resource (ESR) capacity. 03/01/2021 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR029 Revisions to Demand Response Data Definitions and Technical Specifications This Other Binding Document Revision Request (OBDRR) incorporates minor edits to the Other Binding Document, Demand Response Data Definitions and Technical Specifications. The changes include modifications to the Excel templates of Appendix B, NOIE Submission File Template, and Appendix C, REP Event File Template, to improve ease of use and to clarify that numbers of Electric Service Identifiers (ESI IDs) are to be provided as opposed to lists of ESI IDs. Changes also include combining the Other Binding Document’s error descriptions and suggested fixes into a single table, accompanied by additional clarity. 04/07/2021 ERCOT No Demand Response Data Definitions and Technical Specifications Approved
05/26/2021
OBDRR030 Related to NPRR1080, Limiting Ancillary Service Price to System-Wide Offer Cap This Other Binding Document Revision Request (OBDRR) changes the Ancillary Service penalty factors to the effective System-Wide Offer Cap (SWCAP). 06/03/2021 ERCOT and IMM No Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints Approved
07/01/2021
OBDRR031 Change Non-Spinning Reserve Service Deployment This Other Binding Document Revision Request (OBDRR) makes two changes to Non-Spinning Reserve (Non-Spin) deployment to enhance Texas grid reliability. First, it changes the calculation for deploying Non-Spin currently based on High Ancillary Service Limit (HASL) less Generation less the forecasted 30-minute load ramp. The calculation is changed such that it includes Intermittent Renewable Resource (IRR) curtailment, which can often be several GW and can thus significantly affect the amount of generation that can be dispatched. It also changes the 30-minute load ramp to be 30-minute net load ramp, a more accurate measure of system generation dispatch need. Second, a new deployment condition is added when Physical Responsive Capability (PRC) is below 3,200 MW and is not expected to recover within 30 minutes. This will allow operators to deploy Non-Spin in advance of a potential Emergency Condition. A corresponding change in the recall of Non-Spin is also made. 06/24/2021 ERCOT No Non-Spinning Reserve Service Deployment and Recall Procedure Approved
07/01/2021
OBDRR032 Non-Spin Changes Related to NPRR1093, Load Resource Participation in Non-Spinning Reserve This OBDRR aligns the Non-Spinning Reserve Deployment and Recall Procedure with revisions from NPRR1093 to allow Load Resources that are not Controllable Load Resources to provide Non-Spinning Reserve (Non-Spin) Ancillary Service. 09/01/2021 ERCOT No Non-Spinning Reserve Service Deployment and Recall Procedure Approved
OBDRR033 ORDC Changes Related to NPRR1093, Load Resource Participation in Non-Spinning Reserve This OBDRR aligns the Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder with revisions from NPRR1093 to allow Load Resources that are not Controllable Load Resources to provide Non-Spinning Reserve (Non-Spin) Ancillary Service. 09/01/2021 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR034 Related to NPRR1099, Managing Network Operations Model Resource Nodes This Other Binding Document Revision Request (OBDRR) provides ERCOT with the authority to move Network Operations Model Resource Nodes for Point of Interconnection (POI) changes or Resource retirements. 09/29/2021 ERCOT No Procedure for Identifying Resource Nodes Approved
04/01/2022
OBDRR035 Related to NPRR1101, Create Non-Spin Deployment Groups made up of Generation Resources Providing Off-Line Non-Spinning Reserve and Load Resources that are Not Controllable Load Resources Providing Non-Spinning Reserve This Other Binding Document Revision Request (OBDRR) aligns the Non-Spinning Reserve Deployment and Recall Procedure with revisions from NPRR1101. 10/20/2021 ERCOT No Non-Spinning Reserve Service Deployment and Recall Procedure Approved
OBDRR036 Related to NPRR1106, Deployment of Emergency Response Service (ERS) Prior to Declaration of EEA This Other Binding Document Revision Request (OBDRR) revises the Emergency Response Service Procurement Methodology document to state that ERCOT will make an initial allocation of the annual expenditure limit to each Emergency Response Service (ERS) Time Period in each ERS Standard Contract Term based on the expected risk of deploying ERS in that ERS Time Period, to remove outdated language pertaining to the ERS Offer Cap and its relationship to historical prices paid to the Transmission and/or Distribution Service Provider (TDSP) Load Management Programs, and to include language to clarify that ERCOT has discretion to revise and re-issue Requests for Proposal (RFPs) prior to the offer submission deadline. 11/19/2021 ERCOT No Emergency Response Service Procurement Methodology Approved
12/17/2021
OBDRR037 Power Balance Penalty and Shadow Price Cap Updates to Align with PUCT Approved High System-Wide Offer Cap At the December 2, 2021 Public Utility Commission of Texas (PUCT) Open Meeting, the PUCT Commissioners approved an amendment to P.U.C. SUBST. R. 25.505, Reporting Requirements and the Scarcity Pricing Mechanism in the Electric Reliability Council of Texas Power Region, to change the High System-Wide Offer Cap (HCAP) to a value of $5,000/MWh with an effective date of January 1, 2022. As a result of that rule change, this Other Binding Document Revision Request (OBDRR) changes the Power Balance Penalty Curve to cap the curve at $5,001/MWh, i.e., HCAP plus $1/MWh. This effectively means that the price on the curve will be at its maximum value at MW violations above 100 MW. This is similar to how the Power Balance Penalty Curve is adjusted when the Low System-Wide Offer Cap (LCAP) is in effect. This OBDRR also reduces the Generic Transmission Constraint Shadow Price cap for Base Case/Voltage Violations from $9,251/MW to $5,251/MW. Related changes are also proposed to grey-box language that describes how the Power Balance Penalty Price will work with the new HCAP upon implementation of Real-Time Co-optimization. Finally, a numerical example in Section 3.5.1 is updated to reflect the new HCAP value. 12/14/2021 ERCOT No Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints Approved
OBDRR038 Minimum Contingency Level Updates to Align with PUCT Order At the December 16, 2021 Public Utility Commission of Texas (PUCT) Open Meeting, the PUCT ordered ERCOT to change the minimum contingency level (“X”) used in the ORDC process from 2,000 MW to 3,000 MW, effective January 1, 2022. As a result of that PUCT directive, this Other Binding Document Revision Request (OBDRR) updates the parameter within the relevant methodology document. 12/22/2021 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR039 ORDC Changes Related to NPRR1120, Create Firm Fuel Supply Service This Other Binding Document Revision Request (OBDRR) removes the High Sustained Limits (HSLs) of Resources deployed for Firm Fuel Supply Service (FFSS) from the Operating Reserve Demand Curve (ORDC) reserve calculation, as proposed in the 2/7/22 IMM comments to NPRR1120. The 2/7/22 IMM comments were discussed at the NPRR1120 workshop held on February 9, 2022. 02/15/2022 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR040 ORDC Changes Related to NPRR1131, Controllable Load Participation in Non-Spin This Other Binding Document Revision Request (OBDRR) removes the Controllable Load Resource providing Non-Spinning Reserve (Non-Spin) schedules and Regulation Service schedules from the capacity calculations in alignment with NPRR1131 as a standing deployment. 04/25/2022 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
08/23/2024
OBDRR041 Updates to Requirements for Aggregate Load Participation in the ERCOT Markets This Other Binding Document Revision Request (OBDRR) makes small adjustments to the requirements for Aggregate Load Resource (ALR) participation in the ERCOT markets. 05/18/2022 Tesla No Requirements for Aggregate Load Resource Participation in the ERCOT Markets Withdrawn
OBDRR042 Related to NPRR1142, ERS Changes to Reflect Updated PUCT Rule Changes re SUBST. R. 25.507 This Other Binding Document Revision Request (OBDRR) increases the annual budget for the Emergency Response Service (ERS) and makes other administrative changes to the ERS program. 07/14/2022 ERCOT Pending Emergency Response Service Procurement Methodology Approved
08/26/2022
OBDRR043 Related to NPRR1148, Language Cleanup Related to ERCOT Contingency Reserve Service (ECRS) This Other Binding Document Revision Request (OBDRR) aligns the ORDC methodology with the Protocol revisions of NPRR1148. 08/30/2022 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR044 Related to NPRR1085, Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs) This Other Binding Revision Request (OBDRR) aligns the ORDC pricing with the Protocol revisions of NPRR1085 related to the ONHOLD status treatment of Resources. 02/14/2023 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR045 Additional Revisions to Demand Response Data Definitions and Technical Specifications This Other Binding Document Revision Request (OBDRR) incorporates minor edits to the Other Binding Document Demand Response Data Definitions and Technical Specifications. Changes include modifications to the list of Electric Service Identifiers (ESI IDs) provided to Retail Electric Providers (REPs) as well as a correction of several dates. 04/21/2023 ERCOT No Demand Response Data Definitions and Technical Specifications Approved
OBDRR046 Related to NPRR1188, Implement Nodal Dispatch and Energy Settlement for Controllable Load Resources This Other Binding Document Revision Request (OBDRR) aligns the Procedure for Identifying Resource Nodes with the revisions from NPRR1188 to accommodate nodal Dispatch and Settlement of Controllable Load Resources (CLRs) that are not Aggregate Load Resources (ALRs). 06/27/2023 ERCOT No Procedure for Identifying Resource Nodes Approved
OBDRR047 Revision to ERS Procurement Methodology regarding Unused Funds from Previous Terms This Other Binding Document Revision Request (OBDRR) clarifies treatment of unused funds from previous Emergency Response Service (ERS) Standard Contract Terms. 06/30/2023 ERCOT No Emergency Response Service Procurement Methodology Approved
09/15/2023
OBDRR048 Implementation of Operating Reserve Demand Curve (ORDC) Multi-Step Price Floor The Other Binding Document Revision Request (OBDRR) adds two price floors to the Operating Reserve Demand Curve (ORDC): one at reserve levels below 6,500 megawatts (MW) ($20 per megawatt hour (MWh)), and another between 6,500 MW and 7,000 MW ($10 per MWh). 08/11/2023 ERCOT No Methodology for Implementing Operating Reserve Demand Curve (ORDC) to Calculate Real-Time Reserve Price Adder Approved
OBDRR049 ORDC Changes Related to NPRR1203, Implementation of Dispatchable Reliability Reserve Service This Other Binding Document Revision Request (OBDRR) aligns this Other Binding Document with revisions from NPRR1203 creating the new Dispatchable Reliability Reserve Service (DRRS). 09/27/2023 ERCOT No Methodology for Implementing ORDC to Calculate Real-Time Reserve Price Adder Withdrawn
OBDRR050 Non-Spin Changes Related to NPRR1203, Implementation of Dispatchable Reliability Reserve Service This OBDRR aligns this Other Binding Document with revisions from NPRR1203 creating the new Dispatchable Reliability Reserve Service (DRRS). 10/09/2023 ERCOT No Non-Spinning Reserve Deployment and Recall Procedure Withdrawn
OBDRR051 Related to NPRR1216, Implementation of Emergency Pricing Program This Other Binding Document Revision Request (OBDRR) align this methodology with the system changes required for the Emergency Pricing Program (EPP). 01/23/2024 ERCOT No Methodology for Implementing ORDC to Calculate Real-Time Reserve Price Adder Approved
OBDRR052 Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era This Other Binding Document Revision Request (OBDRR) inserts terminology associated with Energy Storage Resources (ESRs) in the appropriate places throughout the Procedure for Identifying Resource Nodes, aligning provisions and requirements for ESRs with those already in place for Generation Resources and Controllable Load Resources. This OBDRR is applicable to ESRs in the future single-model era and should be implemented simultaneously with NPRR1246 and NPRR1014, BESTF-4 Energy Storage Resource Single Model. 07/31/2024 ERCOT No Procedure for Identifying Resource Nodes Pending
OBDRR053 Alignment with NPRR1131, Controllable Load Resource Participation in Non-Spin, and Minor Clean-Ups This Other Binding Document Revision Request (OBDRR) aligns the Non-Spinning Reserve Deployment and Recall Procedure with revisions from Nodal Protocol Revision Request (NPRR) 1131, Controllable Load Resource Participation in Non-Spin, along with other minor clean-ups. 10/17/2024 ERCOT No Non-Spinning Reserve Deployment and Recall Procedure Pending