Summary

Title Clarification of ERCOT’s Authority to Protect Its Jurisdictional Status
Next Group
Next Step
Status Approved on 02/20/2018
Effective Dates
02/21/2018

Action

Date Gov Body Action Taken Next Steps
02/20/2018 BOARD Approved
01/25/2018 TAC Recommended for Approval Revision Request Consideration
01/18/2018 PRS Recommended for Approval Revision Request Consideration

Voting Record

Date Gov Body Motion Result
02/20/2018 BOARD To approve NPRR861 as recommended by TAC in the 1/25/18 TAC Report. Passed
01/25/2018 TAC To recommend approval of NPRR861 as recommended by PRS in the 1/18/18 PRS Report and as amended by the 1/18/18 ERCOT comments. Passed
01/18/2018 PRS To grant NPRR861 Urgent status. To recommend approval of NPRR861 as revised by PRS and to forward to TAC. Passed

Background

Status: Approved
Date Posted: Dec 21, 2017
Sponsor: ERCOT
Urgent: Yes
Sections: 1.2, 4.4.4
Description: At the PUCT’s December 14, 2017 meeting, the Commissioners instructed ERCOT to submit an NPRR to clarify that ERCOT will take action—including denying transactions across high voltage Direct Current Ties (DC Ties) between the ERCOT Region and Mexico or ordering disconnection of Transmission Facilities—to prevent a change to the jurisdictional status quo of ERCOT and Market Participants with respect to the Federal Energy Regulatory Commission (FERC) by such transactions. Jurisdiction of FERC FERC’s jurisdiction is derived from the Federal Power Act (FPA). Under the FPA, entities subject to FERC’s plenary jurisdiction are known as “public utilities.” The FPA gives FERC broad authority to regulate the activities of public utilities, including authority to ensure that public utility rates are just, reasonable, and non-discriminatory. ERCOT and its Market Participants are generally not subject to the plenary jurisdiction of FERC, and are therefore not considered public utilities under the FPA. FERC does not have plenary jurisdiction over ERCOT because electric energy generated in the ERCOT Region is not transmitted in “interstate commerce,” as defined by the FPA, except for certain interconnections ordered by FERC that do not give rise to broader FERC jurisdiction. Existing DC Ties with Mexico Three DC Ties presently connect the ERCOT Region to Mexico. The transmission of electric energy from the ERCOT Region over the existing DC Ties with Mexico does not alter ERCOT’s non-jurisdictional status based on the scope of FERC’s jurisdiction under the FPA and the current structure of the electric grids in the United States and Mexico. The principal Mexican national electric grid is not presently interconnected with any state in the United States other than Texas. Therefore, electric energy does not pass between Texas and any other state in the United States through Mexico on a regular basis. Proposed Interconnections At least two proposed interconnections involving the Mexican national grid and other states in the United States would allow the transfer of electric energy between Texas and other states in the United States. The first is the planned interconnection by Nogales Transmission, L.L.C. and Nogales Frontier Operations, L.L.C. of the UNS Electric, Inc. system near Nogales, Arizona with the Mexican national electric grid near Sonora, Mexico. The second is Mexico’s planned interconnection of the Baja California, Mexico system, which is already synchronously connected to the state of California, with the mainland Mexico national electric grid. The interconnections would asynchronously connect the ERCOT Region with Arizona and California, respectively, via the mainland Mexico national electric grid. Certain decisions of FERC suggest that either project could alter ERCOT’s non-jurisdictional status. Reason for NPRR ERCOT submits this NPRR in order to clarify that it can and will take all actions necessary to preserve the jurisdictional status quo and avoid causing any Entity that is not a public utility under the FPA to become such a public utility. ERCOT’s possible actions include but are not limited to ordering the disconnection of Transmission Facilities and denial or curtailment of an Electronic Tag (e-Tag).
Reason: Clarifying current authority and providing additional details concerning how that authority may be carried out.

Key Documents

Related Content