to table PGRR075 and refer the issue to the Dynamics Working Group (DWG) and Planning Working Group (PLWG)
Passed
Background
Status:
Approved
Date Posted:
Oct 22, 2019
Sponsor:
ERCOT
Urgent:
No
Sections:
5.7.1, 6.2, 6.2.2, 6.2.4, 6.2.5 (delete)
Description:
This Planning Guide Revision Request (PGRR) adds a requirement for Resource Entities and Interconnecting Entities (IEs) to provide model quality test results that demonstrate appropriate performance for submitted dynamic models. Additional revisions are proposed to: Clarify that dynamic model data shall be provided using the appropriate dynamic model template; Raise awareness of requirements associated with user written dynamic models (move from Dynamics Working Group Procedure Manual to Planning Guide); Make various miscellaneous language updates and corrections, including the elimination of Section 6.2.5, which has been superseded by North American Electric Reliability Corporation (NERC) Reliability Standard PRC-002-2, Disturbance Monitoring and Reporting Requirements, and Nodal Operating Guide Section 6.1.3, Phasor Measurement Recording Equipment Including Dynamic Disturbance Recording Equipment.
Reason:
Other: Improve dynamic model quality in alignment with 2019 Reliability and Operations Subcommittee (ROS) goals