RRGRR009

    Summary

    Title: Adding Voltage Limit Sets, Relay Loadability, MLSE, and GMD Data
    Next Group:
    Next Step:
    Status: Approved on 10/11/2016
    Effective Date: 05/08/2017

    Action

    Date Gov Body Action Taken Next Steps
    10/11/2016 Board of Directors Approved
    07/28/2016 TAC Recommended for Approval Revision Request Consideration
    07/07/2016 ROS Recommended for Approval Revision Request Consideration
    06/09/2016 ROS Deferred/Tabled Revision Request Consideration
    06/03/2016 RDWG Recommended for Approval Revision Request Consideration
    04/25/2016 RDWG Recommended for Approval Impact Analysis Consideration
    03/28/2016 RDWG Deferred/Tabled Language Consideration

    Voting Record

    Date Gov Body Motion Result
    10/11/2016 Board of Directors To approve RRGRR009 as recommended by TAC in the 7/28/16 TAC Report with an ERCOT Board action effective date of 8/9/16. Passed
    07/28/2016 TAC To recommend approval of RRGRR009 as recommended by ROS in the 7/7/16 ROS Report and as amended by the 7/20/16 ERCOT comments. Passed
    07/07/2016 ROS To recommend approval of RRGRR009 as recommended by RDWG in the 6/3/16 RDWG Report as amended by the 6/30/16 NRG comments. Passed
    06/09/2016 ROS To table RRGRR009. Passed
    06/03/2016 RDWG To endorse and forward to ROS the 4/25/16 RDWG Report as amended by the 5/11/16 ERCOT comments and the Impact Analysis for RRGRR009 with a recommended priority of 2016 and rank of 1505. Passed
    04/25/2016 RDWG To recommend approval of RRGRR009 as amended by the 3/8/16 ERCOT comments and as revised by RDWG. Passed
    03/28/2016 RDWG To table RRGRR009. Passed

    Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.

    Background

    Status: Approved
    Date Posted: 02/26/2016
    Sponsor: ERCOT
    Urgent: No
    Sections: 2
    Description: This Resource Registration Glossary Revision Request (RRGRR) adds three categories of data: Voltage limits are needed for Resources to indicate that their substation transmission level equipment is limited to a certain range of voltages. The relay loadability limits indicate the limits of loading for certain equipment. Geomagnetic Disturbance is a newly emphasized risk to the grid. The addition of geomagnetically-induced currents and the presence of blocking devices will allow for the study of any vulnerability due to Geomagnetic Disturbance. The addition of a Most Limiting Single Element (MLSE) allows a Resource Entity to identify an MLSE even if that element affects a line not owned by a Resource Entity.
    Reason: Other