SMOGRR018

    Summary

    Title: EPS Metering for Three-Wire Wye Configurations
    Next Group:
    Next Step:
    Status: Approved on 12/01/2016
    Effective Date: 01/01/2017

    Action

    Date Gov Body Action Taken Next Steps
    12/01/2016 TAC Approved
    11/02/2016 WMS Recommended for Approval TAC for consideration
    10/20/2016 MWG Recommended for Approval WMS for consideration
    09/22/2016 MWG Recommended for Approval MWG for Impact Analysis review

    Voting Record

    Date Gov Body Motion Result
    12/01/2016 TAC To approve SMOGRR018 as recommended by WMS in the 11/2/16 WMS Report Passed
    11/02/2016 WMS To recommend approval of SMOGRR018 as recommended by MWG in the 10/20/16 MWG Report Passed
    10/20/2016 MWG To endorse and forward to WMS the 9/22/16 MWG Report and Impact Analysis for SMOGRR018 Passed
    09/22/2016 MWG To recommend approval of SMOGRR018 as submitted Passed

    Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.

    Background

    Status: Approved
    Date Posted: 08/29/2016
    Sponsor: TIEC
    Urgent: No
    Sections: 1.3.2, 1.4.1
    Description: This Settlement Metering Operating Guide Revision Request (SMOGRR) allows an ERCOT-Polled Settlement (EPS) Meter to be installed for a facility that is connected to a three-wire wye, high or low impedance grounded distribution system, if the high or low impedance ground is installed as part of a fault monitoring system for the facility and no phase to ground loads or phase to ground sources are connected behind the metering point.
    Reason: Addresses current operational issues

    Key Documents