Emergency Operations Plan – Reminder that plans are due by February 15, 2022
ERCOT
5.
NOGRR215 Limited Use of RAS
ERCOT
6.
ECL#5 NPRR1084 Improvements to Reporting of Resource Outages and Derates.
Ian Haley
7.
ECL#6 NPRR1085 Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs).
Lori Simpson
8.
NOGRR226 Revision to 5% Transmission Operator (TO) Load Shedding Relay Set Point
LCRA
9.
ECL#73 Should there be different PRC EEA trigger point & ORDC minimum reserves levels for winter and summer given potential for different events?
OWG
10.
Emergency Condition list – Using Instant Messaging during EEA Events. SCR
Kunkel/ERCOT
11.
NPRR1100 Emergency Switching Solutions for Energy Storage Resources
OWG
12.
TAC Assignment: Following the 12/16/21 PUCT approval of NPRR1105, Option to Deploy Distribution Voltage Reduction Measures Prior to Energy Emergency Alert (EEA), review and evaluate the effectiveness and criteria to use when deploying voltage reduction before EEA