MIS LOG IN

OWG Meeting

February 19, 2015
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Teleconference: 877-668-4493
Meeting number: 655 638 653
Meeting password: owg0219

Agenda

1.

Antitrust Admonition

Warren

8:30 am

2.

ROS Meeting Report --

Warren

 

3.

OWG meeting notes approval:  January meeting notes review and approval.

All

 

4.

NOGRRs for review and language changes:

  • 135NOGRR Constraint Management During Energy Emergency Alerts. This Nodal Operating Guide Revision Request (NOGRR) seeks to improve management of congestion during an Energy Emergency Alert (EEA) by proposing:
    ...Language that provides a mechanism for ERCOT Operations to manage constraints in EEA 2 or 3 to higher Facility ratings when applicable for those constraints identified as limiting generation output; and
    ...Language that reconsiders use of double-circuit contingencies during emergency operations based on Grid conditions [ERCOT]Language Review (ROS assignment to review duplicate language with NPRR642) To recommend approval and discuss fixing the duplicative language at a later point.  Duplicate language was requested in ROS.
  • 138NOGRR Delete Grey Box for Reporting of Back-up Control Plan Submittal. This Nodal Operating Guide Revision Request (NOGRR) proposes the discontinuation of the posting requirement for Discontinue Backup Control Plan Submittal Results, ERCOT Market Information List (EMIL) ID, NP8-510M and Backup Control Plan Test Dates and Results Summary Reports, EMIL ID NP8-922-M. Language Review (To endorse and forward to ROS.)
  • 139NOGRR Under/Over-Frequency Relaying Requirements. This Nodal Operating Guide Revision Request (NOGRR) adds over-frequency relaying requirements and clarifies under-frequency and over-frequency relay set-points so that Generation Resources know what is expected.  Over-frequency relay set points criteria was approved by NERC in March 2014 under Standard PRC-024, Generator Frequency and Voltage Protective Relay Settings. [ERCOT] Language Review (To endorse and forward to ROS.)
  • 142NOGRR Phasor Measurement.  This Nodal Operating Guide Revision Request (NOGRR) represents the consensus recommendation of the Phasor Measurement Task Force (PMTF) as the binding language required to meet the top three Synchrophasor use cases identified by ERCOT staff and the PMTF as having merit in the ERCOT region. [PMTF] Language Review (To recommend approval as submitted.)

All

 

5.

Operations Report

  • Monthly Operations Report Summary/Questions --

ERCOT

 

6.

Operations Task Force Report 

  • Action Items: No Report and will need to retire.
   

7.

Texas RE Update Report

  • Standards Updates  
   

8.

System Operations Report

  • Operating Procedure changes that impact market participants.

ERCOT

 

9.

Seminar Task Force Report

  • OTS report -- Dry-Run starts today!

ERCOT

 

10.

Other:

  1. At our November OWG meeting Frank requested that ERCOT (Bill Blevins) be at next meeting to discuss oscillation issues in Panhandle.
  2. ERCOT (Stephen Solis) update on Voltage Control Workshop.

All

 
 

Adjourn

 

3:30 P.M.

Scheduled OWG Meetings

Key Documents

Feb 19, 2015 - doc - 62.5 KB
Feb 10, 2015 - pptx - 191.2 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content