MIS LOG IN

DSWG Discussion of New DR Products

March 19, 2012
01:30 PM - 04:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 206A
Teleconference: 877-668-4493
Meeting number: 652 252 900
Meeting password: Products123!!

Agenda

1.

Antitrust Admonition

ERCOT

1:30 p.m.

2.

Purpose of this Subgroup

M. Smith

1:35 p.m.

3.

Delineation of Component DR Options and Issues

  • 30-minute DR pilot
  • ERS dispatch ramp period options
  • Accommodation of temperature sensitive loads
  • Accommodation of Seasonal loads
  • DR Products/Options to address GE Study Wind/load ramping issue
  • DR services  in other ISOs that might benefit ERCOT

M. Smith

1:40 p.m.

4.

Prioritization of Options and Issues

M. Smith

2:20 p.m.

5.

Proposed 30-Minute DR Product Pilot Project

  • ERCOT’s vision
  • Timing of Pilot
  • Input needed from Subgroup
  • Work plan

S. Krein

2:50 p.m.

6.

Subgroup deliverables & timeline

  • Whitepaper?
  • Draft NPRRs?
  • Technical Requirements Document revisions?

M. Smith

3:30 p.m.

7.

Next Steps Discussion           

M. Smith

3:50 p.m.

 

Adjourn

T. Carter

4:00 p.m.

Scheduled DSWG Meetings

Key Documents

Mar 20, 2012 - doc - 39.5 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content