System Protection Working Group (SPWG) Meeting

March 21, 2013
08:00 AM - 05:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168

Agenda

1.

Antitrust Admonition

D. Ee

8:15 a.m.

2.

Roster, SPWG email list, calendar & SPWG procedures review/update

D. Ee


3.

Review & Approval of minutes from previous meeting

  • Action item review
  • Recap of activity since Nov 2012 meeting

D. Ee


4.

Texas RE Updates

  • 2012 Qtr 4 Misoperation Analysis
  • Updates on the Misoperation Task Force Paper
  • NERC System Protection and Control Subcommittee White Paper on the SPS definition Proposed Changes.
  • TADS Survey (Failed AC Sub Equip and Human Error) and other comments. 

D. Penney


5.

ERCOT Updates

  • RARF Project Purpose and type of effort required of SPWG, new consultant to be hired to assist in the project.

J. Teixeira


6.

ROS Meeting Updates

  • March meeting was cancelled, SPWG update was sent.
  • Updates since last SPWG meeting.

D. Ee


7.

Guidelines for Applying k-Factor

  • Finalize existing entries and/or add more.

D. Ee


8.

Wind Farm Modeling Guide Initiative

P. Belkin


9.

General Discussion on ERCOT Disturbance Monitoring Equipment Requirements

  • ERCOT and TRE comments.  Current status and future plans.
  • SPWG member comments.

D. Ee


10.

NOGRR 107 discussion

  • Recap of  NOGRR 107
  • See: https://www.ercot.com/mktrules/issues/nogrr/101-125/107/index 

D. Ee/R. Jones


11.

Application of TRE Misop procedures to Autos/Transformer connections (reportable/non-reportable

B. Burford


12.

FERC Order 754

  • How are you handling and how it’s going
  • Unique cases

K. Koellner


13.

Distribution fault Anticipation technology

  •  http://www.statesman.com/news/news/local/texas-am-professor-hopes-his-system-can-help- elect/nTkfm/  

K. Koellner


14.

Lessons Learned, Event Review and other topics

ALL


15.

Review items requiring submittal before the next SPWG meeting (as needed)

D. Ee