MIS LOG IN

COMETWG

May 01, 2006
09:00 AM - 04:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
206B
Dial-In: 512.248.3820
Dial-In Code: 4555

Agenda

1.

Antitrust Admonition

T. Bates

9:00 a.m.

2.

Introductions

T. Bates

9:05 a.m.

3.

Scope of the PUCT Request

PUCT Staff

9:15 a.m.

4.

Brainstorm File Structure and Data Exchange Format (see question 1 below)

T. Bates

M. McCabe

9:45 a.m.

5.

Break

 

10:30 a.m.

6.

Brainstorm File Structure and Data Exchange Format (cont.)

T. Bates

M. McCabe

10:45 a.m.

Lunch

 

11:30 a.m.

7.

Brainstorm Frequency of Data Collection (see question 2 below)

T. Bates

M. McCabe

12:30 a.m.

8.

Brainstorm Market Expectation for Data Granularity (see question 3 below)

T. Bates

M. McCabe

1:00 p.m.

9.

Brainstorm Market Expectation for Minimum Functionality (see question 4 below)

T. Bates

M. McCabe

2:00 p.m.

10.

Break

 

2:45 p.m.

11.

Brainstorm Market Expectation for Minimum Functionality (cont.)

T. Bates

M. McCabe

3:00 p.m.

12.

Review Plans and Assignments for Next Meeting

T. Bates

3:30 p.m.

13.

Future COMET WG Meetings  IF NECCESSARY

  • May 15, 2006 (ERCOT MET Center)
  • May 25 or 26, 2006 (ERCOT MET Center)
  • June 8, 2006 (ERCOT MET Center)
  • June 19, 2006 (ERCOT MET Center)
  • June 29, 2006 (ERCOT MET Center)

 

 

4:00 p.m.

 

 

 

 

Commission Staff has requested some informal feedback from the market pertaining to project #31418 Advanced Metering. 

  1. Provide input/recommendations on the file structure and data exchange format for metering information available from advanced metering networks.
    1. Scope is limited to the file structure and data exchange format for information exchange outside of the current market transactions required to support ERCOT settlements.
    2. Options to provide feedback on:
      1. Assume the REP has access to the meter, similar to large customers where the REP currently has read access for IDR data.
      2. Assume that the TDSP is responsible for collecting this information from the network and the data will be made available to the market after it has been collected.
      3. Other?
  2. Provide input/recommendations on the market expectations for the frequency of data collection from advanced metering networks. (hourly, daily, weekly, monthly)
  3. Provide input/recommendations on the market expectations for data granularity from advanced metering networks. (15 minute, hourly, daily, weekly, monthly)
    1. Information for REP billing
      1. Current market
      2. Future offerings (be specific in general terms)
    1. Information for ERCOT Settlements
      1. Current market
      2. Future market enhancements (be specific)
  4.  Provide input/recommendations on the market expectations for the minimum functionality expected from advanced metering networks.

Scheduled RMWG Meetings

Key Documents

May 2, 2006 - doc - 106 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content