- Home
- Meeting Calendar
- Event Details
ROS Information Session - Webex Only |
May 07, 2020
09:30 AM |
Teleconference: 877-668-4493
Meeting number: 290 105 946
Meeting password: ROS
|
Comments
Agenda
1. |
Antitrust Admonition |
K. Bunch |
9:30 a.m. |
2. |
Agenda Review |
K. Bunch |
|
3. |
Technical Advisory Committee (TAC) Update |
K. Bunch |
9:35 a.m. |
4. |
ERCOT Reports |
9:40 a.m. |
|
Operations Report |
ERCOT Staff |
||
System Planning Report |
J. Billo |
||
System Operating Limits (SOL) Methodology Update |
D. Woodfin |
||
Panhandle and West Texas Stability Studies Update |
J. Schmall |
||
5. |
NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications (Possible Email Vote) |
LCRA/ERCOT |
10:25 a.m. |
6. |
NPRR1002, BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions, (Possible Email Vote) |
S. Sharma |
10:45 a.m. |
7. |
Revision Requests Tabled at PRS, Referred to ROS (Possible Email vote) |
K. Bunch |
11:00 a.m. |
NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols |
|||
8. |
ROS Revision Requests (Possible Email Vote) |
K. Bunch |
11:10 a.m. |
Impact Analysis Review |
|||
NOGRR200, Delete Remaining Grey-Boxed Language Associated with NOGRR025, Monitoring Programs for QSEs, TSPs, and ERCOT |
|||
NOGRR205, Clarification to Grey-boxed Language in Section 4.8.1 |
|||
NOGRR204, Related to NPRR989, BESTF-1 Energy Storage Resource Technical Requirements |
|||
Language Review |
|||
NOGRR207, Related to NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications |
|||
NOGRR208, Related to NPRR1002, BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions |
|||
RRGRR023, Related to NPRR1002, BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions |
|||
NOGRR209, Related to NPRR1003, Elimination of References to Resource Asset Registration Form |
|||
RRGRR024, Related to NPRR1003, Elimination of References to Resource Asset Registration Form |
|||
PGRR079, Related to NPRR1003, Elimination of References to Resource Asset Registration Form |
|||
NOGRR210, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
|||
RRGRR025, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
|||
NOGRR211, RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs |
|||
NOGRR212, Related to NPRR1016, Clarify Requirements for Distribution Generation Resources (DGRs) and Distribution Energy Storage Resources (DESRs) |
|||
RRGRR026, Related to NPRR1016, Clarify Requirements for Distribution Generation Resources (DGRs) and Distribution Energy Storage Resources (DESRs) |
|||
PGRR080, Updated Responsibilities for Performing GMD Vulnerability Assessments |
|||
9. |
Revision Requests Tabled at ROS (Possible Email vote) |
K. Bunch |
11:40 a.m. |
PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions |
|||
NOGRR195, Generator Voltage Control Tolerance Band |
|||
NOGRR199, Related to NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols |
|||
10. |
Planning Working Group (PLWG) |
T. Cook |
12:00 p.m. |
NPRR994, Clarify Generator Interconnection Neutral Project Classification (Possible Email Vote) |
|||
PGRR076, Improvements to Generation Resource Interconnection or Change Request (GINR) Process (PLWG) (Possible Email Vote) |
|||
PGRR077, DC Tie Planning Assumptions (PLWG) (Possible Email Vote) |
|||
PGRR078, Market Data Transparency Update for Planning Postings (Possible Email Vote) |
|||
11. |
Operations Training Group (OTWG) |
Tammie. Chilton |
12:15 p.m. |
OTWG Scope (Possible Email Vote) |
|||
12. |
Other Business |
K. Bunch |
12:20 p.m. |
Posted Reports for Working Groups |
|||
Performance Disturbance Compliance Working Group (PDCWG) |
|||
Network Data Support Working Group (NDSWG ) |
|||
System Protection Working Group (SPWG ) |
|||
Steady State Working Group (SSWG) |
|||
Planning Geomagnetic Disturbance Task Force (PGDTF ) |
|||
Review Open Action Items |
|||
No Report: |
|||
Black Start Working Group (BSWG) |
|||
Dynamic Working Group (DWG) |
|||
Operations Working Group (OWG) |
|||
Voltage Profile Working Group (VPWG) |
|||
Adjourn |
K. Bunch |
12:30 p.m. |
Scheduled ROS Meetings
- Mar 09, 2020 - ROS Email Vote re NPRR987, NPRR989, and NOGRR204
- Apr 02, 2020 - ROS Information Session by WebEx Only (CANCELLED)
- May 07, 2020 - ROS Information Session - Webex Only
- May 11, 2020 - ROS Email Vote re NOGRR200, NOGRR204, NOGRR205, PGRR076, PGRR078, PGRR080, OTWG Scope
- Jun 04, 2020 - ROS Meeting
- Jul 09, 2020 - ROS Meeting
- Aug 06, 2020 - ROS Meeting
Key Documents
All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.
To minimize noise disruptions on the WebEx while allowing maximum participation, a few tips: