MIS LOG IN

Congestion Management Working Group Meeting

May 19, 2008
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 206
Dial-In: 512-225-7280
Dial-In Code: 7714

Agenda

1.

Open Meeting/ Anti-Trust Admonition

Ward/Wagner

9:30-9:35

2.

CCT Model Design

a.       Do we need the same topology for CRR auction and CCT?

b.       Should outages be considered in annual or monthly CCT?

c.       How hard is it to get outage information into the CCT tool? Does the input file flow from the CRR process or is there another process that integrates the NMMS info with the Outage Scheduler info?

d.       Activity flow chart of the timing of development of the model/case

e.       Verify that it will be possible to use the 12 monthly CRR models (w/o outages) for Annual CCT test.  (or figure out that this will not work)

 

What is the set of constraints (contingency / monitored element pair) associated with the existing CSCs and CREs?

 

How will generic constraints (voltage, stability limits, area import constraints) be modeled in the CCT? Does disaggregation work?

 

How will monthly on peak wind output be developed? Will this be developed for each wind location and turned into an HSL for the resource?

 

Discussion of ongoing process for controlling entity validation.

 

ERCOT

9:35-11:45

3.

Lunch

 

11:45 - 1

4.

CCT Carry-Over Items from morning

 

SP Cap Discussions

 

Discuss updated white paper of proposed ERCOT methodology.  Comments to be returned by 5/19 for discussion at 5/19 meeting.

 

ERCOT

1-3:15

5

Review & Next steps

Ward/Wagner

3:15-3:30

Scheduled CMWG Meetings

Key Documents

May 16, 2008 - xls - 23.5 KB
May 19, 2008 - ppt - 755 KB
May 19, 2008 - zip - 3.2 MB
May 16, 2008 - doc - 58 KB
May 16, 2008 - doc - 35 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.