MIS LOG IN

Planning Working Group (PLWG) Meeting

August 28, 2013
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 206A
Teleconference: 877-668-4493
Meeting number: 651 687 630
Meeting password: 0828PLWG**

Agenda

1.

Antitrust Admonition

Moore

9:30 a.m.

2.

Agenda Review

Moore

3.

Update on ROS, TAC and Board Activity on PLWG Matters

  1. Board Activity: PGRR027 Analysis of Subsynchronous Resonance Studies in Transmission Studies
  2. TAC Activity: Principles of Consistency; and PGRR027 Analysis of Subsynchronous Resonance Studies in Transmission Studies
  3. ROS Activity: PGRR027 Deadline for Regional Transmission Plan
  4. Review PLWG PGRR Status Bar

Moore

 

4.

PGRR030  New Planning Guide Section 8A, Declaration of Resource Data Accuracy (Creates a standard declaration form to facilitate compliance with the declaration submission requirement in paragraph (2) of Section 5.3.2 and modifies this paragraph to require submission of this standardized declaration.

  1. Consider Impact Analysis
  2. Final Approval

Flores

 

5.

PGRR028 Evaluation of Compliance of Reactive Requirements {Defines ERCOT’s process for evaluation proposed Generation Resources’ ability to provide reactive power.  Protocol Section 3.15, Voltage Support, defines reactive capability requirements for Generation Resources.  Paragraph (3) of Protocol Section 16.5, Registration of a Resource Entity requires ERCOT to opine upon the capability of the proposed Generation Resource’s ability to meet these requirements}

  1. ERCOT responsibility for updating language has been reassigned within Isabel’s group; PLWG should see proposed language prior to September PLWG meeting

Moore

 

6.

PGRR031 Implement 95% Facility Rating Limit in the Planning Criteria { Changes the planning criteria such that system improvements are planned for installation when studies show existing facilities will be loaded up to 95% of their applicable rating.}

  1. Review Stakeholder filed comments to develop final language

Billo

 

7.

NPRR562 Subsynchronous Reactance

  • Recognize that Workshop rescheduled for September 9, 2013.
  • NPRR562 is focusing on responsibilities for mitigation and who performs studies.
  • A follow up PGRR will be developed to address the assumptions to be used in the studies.
  • This topic is expected to be included in items discussed at Workshop.

Moore

 

8.

Final OPSTF Issues List: Review results from June 26 PLWG meeting discussion re: items on Final OPSTF Issues List; have further discussion to decide if:

  1. Issue 5C: Discrete Load Additions. Do current TSP load forecasting processes capture the significant load additions?
  2. Issue 10: Security constrained deliverability of ancillary services. Should a methodology be developed to account for ancillary service requirement in the generation dispatch or load response in planning and operating studies?

Gnanam

 

9.

Additional Items

Moore

 

10.

Next Meeting

Moore

 

 

Adjourn

 

3:30 p.m.

Scheduled PLWG Meetings

Key Documents

Oct 18, 2021 - xls - 42 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content