Agenda
Log in and validation for ROS Standing Representatives |
S. Clifton |
9:15 a.m. |
|
1. |
Antitrust Admonition |
K. Bunch |
9:30 a.m. |
2. |
Agenda Review |
K. Bunch |
|
3. |
Approval of ROS Meeting Minutes (Vote) |
K. Bunch |
9:35 a.m. |
July 9, 2020 |
|||
August 6, 2020 |
|||
4. |
Technical Advisory Committee (TAC) Update |
K. Bunch |
9:40 a.m. |
5. |
ERCOT Reports |
9:45 a.m. |
|
Operations Report |
ERCOT Staff |
||
System Planning Report |
P. Yan |
||
Transmission Issues Related to Generation Constraints Workshop Update |
J. Billo |
25 min |
|
System Operating Limits (SOL) Methodology Update |
P. Gnana |
15 min |
|
2020 UFLS Survey Results |
D. Sanchez |
||
6. |
RTCTF Update |
M. Mereness |
10:45 a.m. |
NOGRR211, RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs |
|||
7. |
System Protection Working Group (SPWG) |
J. Karlik |
10:55 a.m. |
8. |
Urgency Vote(s) (Vote) |
11:10 a.m. |
|
NOGRR218, Removal of Annual Disturbance Monitoring Equipment Database Submission Requirement |
|||
9. |
Performance Disturbance Compliance Working Group (PDCWG) |
C. Mulholland |
11:25 a.m. |
10. |
New Protocol Revision Subcommittee (PRS) Referrals (Vote) |
K. Bunch |
11:35 a.m. |
NPRR1034, Frequency-Based Limits on DC Tie Imports or Exports |
|||
SCR811, Addition of Intra-Hour PhotoVoltaic Power Forecast to GTBD Calculation |
|||
11. |
Revision Requests Tabled at PRS, Referred to ROS (Possible Vote) |
K. Bunch |
11:55 a.m. |
NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols |
|||
12. |
ROS Revision Requests (Vote) |
K. Bunch |
12:05 p.m. |
Impact Analyses |
|||
NOGRR214, Geomagnetic Disturbance (GMD) Measurement Data Reporting |
|||
PGRR077, DC Tie Planning Assumptions |
|||
Language Review |
|||
NOGRR217, Related to NPRR1039, Replace the Term MIS Public Area with ERCOT Website |
|||
PGRR084, Related to NPRR1039, Replace the Term MIS Public Area with ERCOT Website |
|||
(pending Urgency vote) NOGRR218, Removal of Annual Disturbance Monitoring Equipment Database Submission Requirement |
|||
13. |
Revision Requests Tabled at ROS (Possible Vote) |
K. Bunch |
12:20 p.m. |
PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions |
|||
NOGRR199, Related to NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols |
|||
NOGRR210, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
|||
RRGRR025, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
|||
NOGRR211, RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs |
|||
PGRR081, Related to NPRR1026, BESTF-7 Self-Limiting Facilities and Self-Limiting Resources |
|||
NOGRR215, Limit Use of Remedial Action Schemes |
|||
14. |
Operations Working Group (OWG) |
R. Floyd |
12:45 p.m. |
NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications (Possible Vote) |
|||
NOGRR207, Related to NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications (Possible Vote) |
|||
15. |
Planning Working Group (PLWG) |
T. Cook |
1:00 p.m. |
PGRR082, Revise Section 5 and Establish Small Generation Interconnection Process |
|||
PGRR083, Add RPG Project Number and TPIT Revisions |
|||
16. |
Combo Ballot (Vote) |
K. Bunch |
1:25 p.m. |
17. |
Network Data Support Working Group (NDSWG) |
J. Yatar |
1:35 p.m. |
18. |
Dynamic Working Group (DWG) |
R. Egunjobi |
1:45 p.m. |
19. |
Operations Training Group (OTWG) |
T. Chilton |
1:55 p.m. |
20. |
Voltage Profile Working Group (VPWG) |
B. Mathew |
2:05 p.m. |
21. |
Other Business |
K. Bunch |
2:15 p.m. |
September 14, 2020 Annual TAC Subcommittee Structural Review 1:30 p.m. |
|||
Review Open Action Items |
|||
No Report: |
|||
Black Start Working Group (BSWG) |
|||
Planning Geomagnetic Disturbance Task Force (PGDTF) |
|||
Steady State Working Group (SSWG) |
|||
Adjourn |
K. Bunch |
2:20 p.m. |
Scheduled ROS Meetings
- Jul 09, 2020 - ROS Meeting
- Aug 06, 2020 - ROS Meeting
- Sep 03, 2020 - ROS Meeting
- Oct 08, 2020 - ROS Meeting by Webex Only
- Nov 05, 2020 - ROS Meeting by Webex Only
- Dec 03, 2020 - ROS Meeting by Webex Only
- Jan 07, 2021 - ROS Meeting by Webex Only
Key Documents
All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.
ROS Standing Representatives intending to vote should join through Webex and have access to their company email.