MIS LOG IN

OWG Meeting

September 23, 2010
09:30 AM - 03:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Dial-In: 512-225-7260
Dial-In Code: 4341

Agenda

 

Antitrust Admonition

 

Calhoun

9:30 AM

1.            

ROS meeting Report

 

Calhoun

 

2.            

OWG meeting note’s approval

ALL

 

 

3.            

OGRRs and NOGRRs for review and language changes:

  • 044NOGRR Clarification of a PSS In-Service.  This Nodal Operating Guide Revision Request (NOGRR) clarifies that a Power System Stabilizer (PSS) must be "On" and in an active MW range to be considered in service.  This NOGRR also updates the specific dates of PSS installation from 2008 to 2011. [LCRA] IA Review
  • 048NOGRR Synchronization with OGRR240, CREZ Facility Protection and Control Requirements.  This Nodal Operating Guide Revision Request (NOGRR) provides more stringent protection and control requirements for all new Competitive Renewable Energy Zone (CREZ) 345 kV Facilities.  [AEPSC] Language Consideration
  • 049NOGRR Alignment with NERC Reliability Standard PRC-001-1, System Protection Coordination.  This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with the North American Electric Reliability Corporation (NERC) Reliability Standards, specifically PRC-001-1, System Protection Requirements, Section B. Requirements, R2.2.  This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with the North American Electric Reliability Corporation (NERC) Reliability Standards, specifically PRC-001-1, System Protection Requirements, Section B. Requirements, R2.2. [SPWG] Language Consideration
  • ROS approved the NOGRR043 (OWG comments) as amended by ROS.  ROS directed OWG to resolve the issue relating to the language change made in Section 2.9.1, 1)b): (note - turbines was revised to WGRs)

 

ALL

 

 

4.            

Operations Report

  • Monthly Operations Report Summary/Questions

 

ERCOT/Lety

 

 

5.            

Nodal Operating Guides Review and Revision Task Force Report.

 

Calhoun

 

6.            

Operations Task Force Report

 

Morris/Blackmer

 

7.            

Black Start Task Force Report

 

 

R. Kelm

Kelly Blackmer

 

8.            

Compliance Report

 

 

Texas RE / Andrew Gallo

 

9.            

System Operations

 

Frosch/Leo

 

10.         

Other items.

  • Draft NOGRR for OGRR226 under development. Possibly review of draft language.
  • SSRG Notifications by Ross Owens

 

Reid

 

 

 

11.         

Adjourn

 

ALL

3:00 PM

Scheduled OWG Meetings

Key Documents

Sep 22, 2010 - doc - 36 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content