MIS LOG IN

OWG Meeting

October 22, 2014
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Teleconference: 877-668-4493
Meeting number: 651 750 002
Meeting password: owg102214

Agenda

1.

Antitrust Admonition

Warren

9:30 am

2.

ROS Meeting Report

 

Warren

 

3.

OWG meeting notes approval:  September meeting notes review and approval.

 

All

 

4.

NOGRRs for review and language changes:

  • 135NOGRR Constraint Management During Energy Emergency Alerts. This Nodal Operating Guide Revision Request (NOGRR) seeks to improve management of congestion during an Energy Emergency Alert (EEA) by proposing:
    Language that provides a mechanism for ERCOT Operations to manage constraints in EEA 2 or 3 to higher Facility ratings when applicable for those constraints identified as limiting generation output; and
    Language that reconsiders use of double-circuit contingencies during emergency operations based on Grid conditions [ERCOT]Language Review
  • 136NOGRR Verifying QSE Capability to Operate in CFCThis Nodal Operating Guide Revision Request (NOGRR) establishes a process for ERCOT to conduct Constant Frequency Control (CFC) tests to ensure that Qualified Scheduling Entities (QSEs) can provide this service if ERCOT loses its ability to control system frequency; and removes the CFC definition from the Nodal Operating Guide due to the definition being incorporated into the Protocols via associated NPRR646. [ERCOT] Language Review
  • 137NOGRR Rescind NOGRR034 and Maintain Current Telemetry Performance Reporting Practices This Nodal Operating Guide Revision Request (NOGRR) rescinds the grey-boxed language introduced by NOGRR034, Rescind Telemetry Performance Calculation Exclusions, to maintain current telemetry performance reporting practices. [ERCOT] IA Review
  • 138NOGRR Delete Grey Box for Reporting of Back-up Control Plan Submittal. This Nodal Operating Guide Revision Request (NOGRR) proposes the discontinuation of the posting requirement for Discontinue Backup Control Plan Submittal Results, ERCOT Market Information List (EMIL) ID, NP8-510M and Backup Control Plan Test Dates and Results Summary Reports, EMIL ID NP8-922-M. Language Review
  • 139NOGRR Under/Over-Frequency Relaying Requirements. This Nodal Operating Guide Revision Request (NOGRR) adds over-frequency relaying requirements and clarifies under-frequency and over-frequency relay set-points so that Generation Resources know what is expected.  Over-frequency relay set points criteria was approved by NERC in March 2014 under Standard PRC-024, Generator Frequency and Voltage Protective Relay Settings. [ERCOT] Language Review

 

All

 

5.

Operations Report

  • Monthly Operations Report Summary/Questions

 

ERCOT

 

6.

Operations Task Force Report 

  • Action Items: No Report

 

Tammar

 

 

7.

Texas RE Update Report

  • Standards Updates  

 

Penney

 

8.

System Operations Report

  • Operating Procedure changes that impact market participants.

 

ERCOT

 

9.

Seminar Task Force Report

  • OTS report

 

ERCOT

 

10.

Other:

  1. Update on NOGRR084 Replacement - which defines the Daily Grid Operations Report.
  2. Discuss submitting the draft NPRR and NOGRR on Voltage Control. Postponed
  3. Review proposed changes to OWG Scope

 

 

Julie Thomas (MISUG Chair)

 All

 

11.

Future Meeting Date: November 19th ERCOT Met Center room 168.

 

Warren

 

12.

Adjourn

Warren

3:00 pm

 

 

 

 

Scheduled OWG Meetings

Key Documents

Oct 16, 2014 - doc - 61.5 KB
Oct 16, 2014 - doc - 27.5 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content