- Home
- Meeting Calendar
- Event Details
OWG Meeting |
|
December 15, 2015
09:30 AM - 02:00 PM |
|
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744 Room 168
|
Teleconference: 877-668-4493
Meeting number: 625 334 171
Meeting password: owg1215
|
Agenda
1. |
Antitrust Admonition |
Warren |
9:30 am |
2. |
OWG Nominations |
Warren |
9:35 am |
3 |
Schneider Engineering Presentation |
Schneider |
9:40 am |
4. |
NOGRRs for review and language changes: 143 NOGRR - Alignment of Nodal Operating Guides with NERC Reliability Standard, BAL-001-TRE-1. This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with North American Electric Reliability Corporation (NERC) Reliability Standard, BAL-001-TRE-1. [PDCWG] 149 NOGRR - Revision to Definition of Transmission Operator. This Nodal Operating Guide Revision Request (NOGRR) revises the definition of "Transmission Operator" to establish a "Bright Line" threshold (annual peak MW) below which a Distribution Service Provider (DSP) owning no transmission or generation facilities, and who is not provided or offered Transmission Operator (TO) services from their incumbent Transmission Service Provider (TSP) or wholesale power supplier, would be exempted from having to procure designated TO services from a third-party provider. The "Bright Line" threshold being recommended is 25 MW. [Schneider Engineering] 150 NOGRR - Alignment with NPRR747, Revision of Voltage Control Requirements. This Nodal Operating Guide Revision Request (NOGRR) relocates language concerning voltage support obligations that currently resides in an ERCOT procedure document but that should be moved to the Operating Guide so that the requirements are recognized as binding. Based in part on discussions at the April 8, 2015 Voltage Workshop, this NOGRR also allocates each of various voltage support responsibilities to the appropriate Entity. Additionally, this NOGRR clarifies that the ERCOT Transmission Operator (TO) has the authority to instruct a Qualified Scheduling Entity (QSE) to modify its Generation Resource’s Voltage Set Point. Additional edits are intended to better synchronize language with the North American Electric Reliability Corporation (NERC) Reliability Standards. [ERCOT] 151 NOGRR - Alignment with NPRR748, Revisions associated with COM-002-4 and Other Clarifications Associated with Dispatch Instructions. This Nodal Operating Guide Revision Request (NOGRR) aligns the Operating Guides with changes made in NPRR748 and also provides consistency, transparency, and clarification related to communication protocol in the ERCOT Region. [ERCOT] 747NPRR - Revision of Voltage Control Requirements. This Nodal Protocol Revision Request (NPRR) proposes new definitions related to Voltage Profiles, defines various entities’ responsibilities related to Voltage Support, and also clarifies that the interconnecting Transmission Service Provider (TSP) (or its designated agent) may modify a Generation Resource’s Voltage Set Point). This NPRR addresses issues raised at the April 8, 2015 Voltage Workshop. [ERCOT] 748NPRR - Revisions associated with COM-002-4 and Other Clarifications Associated with Dispatch Instructions. This Nodal Protocol Revision Request (NPRR) aligns with North American Electric Reliability Corporation (NERC) Standard COM-002-4, Operating Personnel Communications Protocols, and provides language clarification for Dispatch Instructions and procedures. [ERCOT] |
All |
|
5. |
ERCOT System Operations Report |
ERCOT |
1:45 PM |
6. |
Future Meeting Dates: Schedule. |
Warren |
2:00 PM |
Adjourned |
All |
Scheduled OWG Meetings
- Oct 22, 2015 - OWG Meeting
- Nov 17, 2015 - OWG Meeting
- Dec 15, 2015 - OWG Meeting
- Jan 26, 2016 - OWG Meeting
- Feb 18, 2016 - OWG Meeting
- Mar 24, 2016 - OWG Meeting
- Apr 22, 2016 - OWG Meeting