MIS LOG IN

2024 Dynamics Working Group

Key Documents

Limited Stability Scope for Model Changes
Upon request by ERCOT, TSPs shall conduct a limited stability study for an IBR modification per Section 5.5(4)(a)(iii)(A) of ERCOT Planning Guide.
Feb 22, 2024 - pdf - 190.3 KB
Large Load Survey for Subsynchronous Studies
Large Load customers, please fill out and return per instructions at bottom of document
Oct 19, 2022 - docx - 35.4 KB
Jan 10, 2025 - docx - 57 KB
ERCOT SSR Study Scope Guidelines
Used to evaluate vulnerability and identify any needed countermeasures.
Jan 20, 2021 - docx - 88.9 KB
Related Content
On this site