NOGRR027

Summary

Title Revise the Process for Submitting Biennial Unit Reactive Limits (Lead and Lag)
Next Group
Next Step
Status Approved on 04/08/2010
Effective Dates
12/01/2010

or per the Nodal Protocol Transition Plan http://www.ercot.com/mktrules/protocols (05/01/10 Nodal Operating Guide Library)

Action

Date Gov Body Action Taken Next Steps
04/08/2010 TAC Approved
03/11/2010 ROS Recommended for Approval TAC for consideration
02/19/2010 OWG Recommended for Approval ROS Consideration
01/18/2010 OWG Recommended for Approval OWG IA Review
12/16/2009 OWG Deferred/Tabled OWG Review
11/17/2009 OWG Deferred/Tabled OWG Review
10/21/2009 OWG Deferred/Tabled OWG Review
09/15/2009 OWG Deferred/Tabled OWG Consideration
08/19/2009 OWG Recommended for Approval OWG IA Review

Voting Record

Date Gov Body Motion Result
04/08/2010 TAC To approve NOGRR027 as recommended by ROS in the 3/11/10 ROS Recommendation Report Passed
03/11/2010 ROS To recommend approval of NOGRR027 as recommended by OWG in the 2/19/10 OWG Recommendation Report and as revised by ROS. Passed
02/19/2010 OWG Consensus to endorse and forward the 1/18/10 OWG Recommendation Report and Impact Analysis for NOGRR027 to ROS
01/18/2010 OWG Consensus to recommend approval of NOGRR027 as revised by OWG
12/16/2009 OWG Consensus to table NOGRR027 for one month
11/17/2009 OWG Consensus to table NOGRR027 for one month
10/21/2009 OWG Consensus to table for one month.
09/15/2009 OWG Consensus to table NOGRR027 for one month.
08/19/2009 OWG Consensus to recommend approval of NOGRR027 as revised by OWG

Background

Status: Approved
Date Posted: Jul 17, 2009
Sponsor: LCRA
Urgent: No
Sections: 3.3.2.1, 3.3.2.2, 3.3.2.3, Section 8 - Attachment E
Description: This Nodal Operating Guide Revision Request (NOGRR) deletes Attachment E, Biennial Unit Reactive Limits (Lead and Lag) Verification in Section 8. Attachment E is no longer used as test results are submitted through the Market Information System (MIS) Certified Area. This NOGRR also updates other sections to align with the current process.
Reason: Attachment E in Section 8 has been superseded by the ERCOT requirement to submit all biennial unit reactive limit tests through the MIS Certified Area. The process for submitting test results through the MIS Certified Area is similar but requires more data than the current form. The circulation of VARs allows the unit to accomplish a lagging reactive test with minimal constraints from the transmission system.