- Home
- Market Rules
- Issues
NOGRR032
Summary
Title | Use of Consistent Rating Terminology |
---|---|
Next Group | |
Next Step | |
Status | Approved on 05/06/2010 |
Effective Dates |
12/01/2010
or per the Nodal Protocol Transition Plan http://www.ercot.com/mktrules/protocols (06/01/10 Nodal Operating Guide Library) |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
05/06/2010 | TAC | Approved | |
04/12/2010 | ROS | Recommended for Approval | TAC Consideration |
03/17/2010 | OWG | Recommended for Approval | ROS Consideration |
02/19/2010 | OWG | Recommended for Approval | OWG IA Review |
01/18/2010 | OWG | Deferred/Tabled | OWG Language Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
05/06/2010 | TAC | To approve NOGRR032 as recommended by ROS in the 4/12/10 ROS Recommendation Report | Passed |
04/12/2010 | ROS | To recommend approval of NOGRR032 as recommended by OWG in the 3/17/10 OWG Recommendation Report | Passed |
03/17/2010 | OWG | Consensus to endorse and forward the 2/19/10 OWG Recommendation Report and the Impact Analysis for NOGRR032 to ROS | |
02/19/2010 | OWG | Consensus to recommend approval of NOGRR032 as submitted | |
01/18/2010 | OWG | Consensus to table NOGRR032 |
Background
Status: | Approved |
---|---|
Date Posted: | Dec 3, 2009 |
Sponsor: | NDSWG |
Urgent: | No |
Sections: | 3.9.4 |
Description: | This Nodal Operating Guide Revision Request (NOGRR) proposes language changes to align rating terminology in the Nodal Operating Guides with the terminology in the Nodal Protocols. Utilization of the same verbiage helps alleviate communication issues and also removes the possible interpretation of additional rating requirements. |
Reason: | Currently there are three defined ratings in the Nodal Protocols: Normal Rating, Emergency Rating, and 15-Minute Rating. Requirements for use of the three ratings are contained throughout the Nodal Protocols. In the Nodal Operating Guides there are three defined ratings: Continuous Rating, Emergency Rating, and 15-Minute Rating. Requirements for the use of these ratings are contained throughout the Nodal Operating Guides and are Nodal Operating Guide embodiments of the Nodal Protocol requirements for Normal Rating, Emergency Rating, and 15-Minute Rating, respectively. Additionally, there is a distinction between Transmission Facility and Transmission Element as it pertains to the Ratings definition. The use of the term Transmission Facility is more encompassing than the term Transmission Element. Per the Nodal Protocols, Ratings pertain to Transmission Elements. This NOGRR proposes a corresponding revision to the Nodal Operating Guides. |
Key Documents
Dec 3, 2009 - doc - 82 KB
Dec 3, 2009 - doc - 64.5 KB
Jan 20, 2010 - doc - 84 KB
Feb 22, 2010 - doc - 85 KB
Feb 24, 2010 - doc - 53 KB
Mar 19, 2010 - doc - 86 KB
Apr 14, 2010 - doc - 88 KB
May 10, 2010 - doc - 88.5 KB