MIS LOG IN

NOGRR073

Summary

Title Entity Responsible for Load Shed During EEA Level 3
Next Group
Next Step
Status Withdrawn

Action

Date Gov Body Action Taken Next Steps
09/01/2011 TAC Approved
08/11/2011 ROS Recommended for Approval TAC for consideration.
07/20/2011 OWG Recommended for Approval ROS for consideration.
06/15/2011 OWG Recommended for Approval OWG for Impact Analysis review.

Voting Record

Date Gov Body Motion Result
09/01/2011 TAC To approve the Request for Withdrawal for NOGRR073. Passed
08/11/2011 ROS To recommend approval of NOGRR073 as recommended by OWG in the 7/20/11 OWG Report. Passed
07/20/2011 OWG To endorse and forward the 6/15/11 OWG Report and Impact Analysis for NOGRR073 to ROS.
06/15/2011 OWG Consensus to recommend approval of NOGRR073 as revised by OWG.

Background

Status: Withdrawn
Date Posted: May 17, 2011
Sponsor: Frank Owens on Behalf of Nodal Protocol and Guides Resolution Task Force (NPGRTF)
Urgent: No
Sections: 4.5.3.4
Description: This Nodal Operating Guide Revision Request (NOGRR) clarifies who is responsible to shed Load during an Energy Emergency Alert (EEA) Level 3 event. This NOGRR also clarifies that ERCOT is responsible for directing Load shedding.
Reason: This NOGRR identifies the Entity responsible for Load shed during an EEA Level 3 event within the Operating Guides and aligns the relevant Operating Guide language with North American Electric Reliability Corporation (NERC) Reliability Standard EOP-003, Load Shedding Plans, and paragraph (4)(a) of Protocol Section 6.5.9.4.2, EEA Levels.

Key Documents