- Home
- Market Rules
- Issues
NOGRR099
Summary
Title | SPS Procedure Changes for Consistency with NERC Reliability Standards |
---|---|
Next Group | |
Next Step | |
Status | Withdrawn on 09/07/2012 |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
09/07/2012 | TAC | Withdrawn | |
06/28/2012 | TAC | Deferred/Tabled | TAC Consideration |
06/13/2012 | OWG | Recommended for Approval | ROS Consideration |
06/14/2012 | ROS | Recommended for Approval | TAC Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
09/07/2012 | TAC | To approve the Request for Withdrawal for NOGRR099 | Passed |
06/28/2012 | TAC | To table NOGRR099 | Passed |
06/13/2012 | OWG | Consensus to recommend approval as amended by the 6/11/12 Oncor comments | |
06/14/2012 | ROS | To recommend approval of NOGRR099 as recommended by OWG in the 6/13/12 OWG Report | Passed |
Background
Status: | Withdrawn |
---|---|
Date Posted: | May 30, 2012 |
Sponsor: | NPGRTF |
Urgent: | Yes |
Sections: | 6.2.2, 6.2.3, 8B |
Description: | This Nodal Operating Guide Revision Request (NOGRR) removes the Protection System Misoperation Report format and procedural references and adds references to reporting per Texas RE procedure(s). |
Reason: | Recent changes to North American Electric Reliability Corporation (NERC) Reliability Standard PRC-004-2a, Analysis and Mitigation of Transmission and Generation Protection System Misoperations, requires the Regional Entity (Texas RE), not ERCOT, to monitor protection systems affecting the ERCOT Transmission Grid. |
Key Documents
May 30, 2012 - doc - 126 KB
Jun 1, 2012 - xls - 129.5 KB
Jun 11, 2012 - doc - 115 KB
Jun 13, 2012 - doc - 42 KB
Jun 13, 2012 - doc - 135 KB
Jun 15, 2012 - doc - 137 KB
Jun 21, 2012 - doc - 54.5 KB
Jun 27, 2012 - doc - 40 KB
Jun 29, 2012 - doc - 140.5 KB
Aug 24, 2012 - doc - 37.5 KB
Sep 10, 2012 - doc - 138 KB