MIS LOG IN

NOGRR150

Summary

Title Alignment with NPRR747, Revision of Voltage Control Requirements
Next Group
Next Step
Status Approved on 08/25/2016
Effective Dates
01/01/2017

Action

Date Gov Body Action Taken Next Steps
08/25/2016 TAC Approved
07/28/2016 TAC Deferred/Tabled TAC for consideration
07/07/2016 ROS Recommended for Approval TAC for consideration
06/23/2016 OWG Recommended for Approval ROS for consideraton
05/19/2016 OWG Recommended for Approval OWG for Impact Analysis review
04/22/2016 OWG Deferred/Tabled Language Consideration
03/24/2016 OWG Deferred/Tabled Language Consideration
02/18/2016 OWG Deferred/Tabled Language Consideration
01/26/2016 OWG Deferred/Tabled Language Consideration
12/15/2015 OWG Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
08/25/2016 TAC To approve NOGRR150 as recommended by ROS in the 7/7/16 ROS Report Passed
07/28/2016 TAC To table NOGRR150 Passed
07/07/2016 ROS To recommend approval of NOGRR150 as recommended by OWG in the 6/23/16 OWG Report as revised by ROS Passed
06/23/2016 OWG To endorse and forward to ROS the 5/19/16 OWG Report and the Impact Analysis for NOGRR150 Passed
05/19/2016 OWG To recommend approval of NOGRR150 as amended by the 4/21/16 ERCOT comments as revised by OWG Passed
04/22/2016 OWG To table NOGRR150 for one month Passed
03/24/2016 OWG To table NOGRR150 Passed
02/18/2016 OWG To table NOGRR150 for one month Passed
01/26/2016 OWG To table NOGRR150 for one month Passed
12/15/2015 OWG To table NOGRR150 for one month. Passed

Background

Status: Approved
Date Posted: Nov 25, 2015
Sponsor: ERCOT
Urgent: No
Sections: 2.2.5, 2.2.10, 2.7, 2.7.1, 2.7.3, 2.7.3 (new), 2.7.3.1 (new), 2.7.3.2 (new), 2.7.3.3 (new), 2.7.3.4 (new), 2.7.3.5 (new), 2.7.4, 2.7.4.1, 2.7.4.2, 2.7.4.3, 3.7, 9.1.9, 9.3.1, 9.3.9
Description: This Nodal Operating Guide Revision Request (NOGRR) relocates language concerning voltage support obligations that currently resides in an ERCOT procedure document but that should be moved to the Operating Guide so that the requirements are recognized as binding. Based in part on discussions at the April 8, 2015 Voltage Workshop, this NOGRR also allocates each of various voltage support responsibilities to the appropriate Entity. Additionally, this NOGRR clarifies that the ERCOT Transmission Operator (TO) has the authority to instruct a Qualified Scheduling Entity (QSE) to modify its Generation Resource’s Voltage Set Point. Additional edits are intended to better synchronize language with the North American Electric Reliability Corporation (NERC) Reliability Standards.
Reason: Addresses current operational issues

Key Documents