to table NOGRR190 and refer the issue to the Operations Working Group (OWG)
Passed
Background
Status:
Withdrawn
Date Posted:
Apr 26, 2019
Sponsor:
Golden Spread Electric Cooperative
Urgent:
No
Sections:
4.5.3.4
Description:
This Nodal Operating Guide Revision Request (NOGRR) would allow distribution voltage level Block Load Transfer (BLT) firm Load deployed in Energy Emergency Alert (EEA) Level 2 to count toward the appropriate Transmission Service Provider’s (TSP’s) or Distribution Service Provider’s (DSP’s) firm Level 3 Load shed obligations under EEA Level 3.
Reason:
Addresses current operational issues, Regulatory requirements