NPRR035

Summary

Title Nodal Protocol Clarifications Required For Net Metering Provisions
Next Group
Next Step
Status Approved on 07/17/2007
Effective Dates
12/01/2010

or per the Nodal Protocol Transition Plan http://www.ercot.com/mktrules/protocols (08/01/07 Nodal Protocols Library)

Action

Date Gov Body Action Taken Next Steps
11/28/2006 TPTF Recommended for Approval Language consideration
07/17/2007 BOARD Approved
06/28/2007 TAC Recommended for Approval Board consideration of this NPRR and its IA
06/12/2007 PRS Recommended for Approval Review of B1G2 Impact Analysis
05/17/2007 PRS Recommended for Approval Impact Analysis review
02/22/2007 PRS Recommended for Approval Impact Analysis review

Voting Record

Date Gov Body Motion Result
11/28/2006 TPTF To recommend approval of NPRR035 as revised by ERCOT comments and TPTF. Passed
07/17/2007 BOARD To approve NPRR035 as recommended by TAC. Passed
06/28/2007 TAC To recommend approval of this NPRR and its IA as recommended by PRS. Passed
06/12/2007 PRS To recommend approval of B1G2 Impact Analysis Passed
05/17/2007 PRS To recommend approval of NPRR035 as revised by ERCOT Staff comments dated 5/9/07. Passed
02/22/2007 PRS To recommend approval of NPRR035 as amended by ERCOT Staff comments [dated 2/14/07]. Passed

Background

Status: Approved
Date Posted: Nov 6, 2006
Sponsor: TPTF
Urgent: No
Sections: 1.3.1.1, 3.7.1.1, 6.5.5.2, 6.6.3.1, 10.3.2.3
Description: Revision to Protocol Section 1.3.1.1(w) adds the submittals to ERCOT by affected Entities that are required under the provisions of Protocol Section 10.3.2.3. This change captures as protected information the descriptions of the metering facilities of all Common Switchyards that contain multiple points of interconnection of Loads (ESIDs) and generation meters (EPS). Revisions to Protocol Section 3.7.1.1 add the requirement to include within the Resource Parameters submittal the methodology and, if utilized, the values of constants in any underlying net injection calculation for each Resource. Revision to Protocol Section 6.5.5.2 clarifies that net power output from generation resources may be provided to ERCOT systems as a measured or calculated value. Revisions to Protocol Section 6.6.3.1, Real-Time Energy Imbalance Payment or Charge at a Resource Node incorporate settlement methodology to be applied in the situation of a net metering installation. Revisions to Protocol Section 10.3.2.3: memorializes the requirement that affected entities provide to ERCOT metering diagrams; and adds the requirement that all Load(s) included in a net metering arrangement for an EPS Metering Facility shall only be electrically connected to the ERCOT grid through the EPS Metering point(s) for such Facility and that these Loads shall not be electrically connected to the ERCOT Grid through electrical connections that are not metered by the EPS metering point(s) for the Facility.
Reason: These changes are required to port the existing net metering provisions of the zonal market to the nodal market implementation. Additionally, these changes clarify that Generation Resource’s must provide net generation output for use by the ERCOT systems.