NPRR035
Summary
Title | Nodal Protocol Clarifications Required For Net Metering Provisions |
---|---|
Next Group | |
Next Step | |
Status | Approved on 07/17/2007 |
Effective Dates |
12/01/2010
or per the Nodal Protocol Transition Plan http://www.ercot.com/mktrules/protocols (08/01/07 Nodal Protocols Library) |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
11/28/2006 | TPTF | Recommended for Approval | Language consideration |
07/17/2007 | BOARD | Approved | |
06/28/2007 | TAC | Recommended for Approval | Board consideration of this NPRR and its IA |
06/12/2007 | PRS | Recommended for Approval | Review of B1G2 Impact Analysis |
05/17/2007 | PRS | Recommended for Approval | Impact Analysis review |
02/22/2007 | PRS | Recommended for Approval | Impact Analysis review |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
11/28/2006 | TPTF | To recommend approval of NPRR035 as revised by ERCOT comments and TPTF. | Passed |
07/17/2007 | BOARD | To approve NPRR035 as recommended by TAC. | Passed |
06/28/2007 | TAC | To recommend approval of this NPRR and its IA as recommended by PRS. | Passed |
06/12/2007 | PRS | To recommend approval of B1G2 Impact Analysis | Passed |
05/17/2007 | PRS | To recommend approval of NPRR035 as revised by ERCOT Staff comments dated 5/9/07. | Passed |
02/22/2007 | PRS | To recommend approval of NPRR035 as amended by ERCOT Staff comments [dated 2/14/07]. | Passed |
Background
Status: | Approved |
---|---|
Date Posted: | Nov 6, 2006 |
Sponsor: | TPTF |
Urgent: | No |
Sections: | 1.3.1.1, 3.7.1.1, 6.5.5.2, 6.6.3.1, 10.3.2.3 |
Description: | Revision to Protocol Section 1.3.1.1(w) adds the submittals to ERCOT by affected Entities that are required under the provisions of Protocol Section 10.3.2.3. This change captures as protected information the descriptions of the metering facilities of all Common Switchyards that contain multiple points of interconnection of Loads (ESIDs) and generation meters (EPS). Revisions to Protocol Section 3.7.1.1 add the requirement to include within the Resource Parameters submittal the methodology and, if utilized, the values of constants in any underlying net injection calculation for each Resource. Revision to Protocol Section 6.5.5.2 clarifies that net power output from generation resources may be provided to ERCOT systems as a measured or calculated value. Revisions to Protocol Section 6.6.3.1, Real-Time Energy Imbalance Payment or Charge at a Resource Node incorporate settlement methodology to be applied in the situation of a net metering installation. Revisions to Protocol Section 10.3.2.3: memorializes the requirement that affected entities provide to ERCOT metering diagrams; and adds the requirement that all Load(s) included in a net metering arrangement for an EPS Metering Facility shall only be electrically connected to the ERCOT grid through the EPS Metering point(s) for such Facility and that these Loads shall not be electrically connected to the ERCOT Grid through electrical connections that are not metered by the EPS metering point(s) for the Facility. |
Reason: | These changes are required to port the existing net metering provisions of the zonal market to the nodal market implementation. Additionally, these changes clarify that Generation Resource’s must provide net generation output for use by the ERCOT systems. |
Key Documents
Nov 6, 2006 - doc - 217 KB
Nov 21, 2006 - doc - 168.5 KB
Nov 21, 2006 - doc - 153 KB
Dec 6, 2006 - doc - 153.5 KB
Jan 17, 2007 - doc - 59.5 KB
Jan 29, 2007 - doc - 281.5 KB
Feb 14, 2007 - doc - 181.5 KB
Feb 23, 2007 - doc - 235.5 KB
May 9, 2007 - doc - 185.5 KB
May 22, 2007 - doc - 236 KB
Jun 8, 2007 - doc - 77 KB
Jun 13, 2007 - doc - 70 KB
Jun 13, 2007 - doc - 228.5 KB
Jul 13, 2007 - doc - 234 KB
Jul 19, 2007 - doc - 237.5 KB
Jan 2, 2008 - xls - 75.5 KB