NPRR1066
Summary
Title | Interconnection of Existing Generation Owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) Transferring Load into the ERCOT System |
---|---|
Next Group | |
Next Step | |
Status | Approved on 04/13/2021 |
Effective Dates |
05/01/2021
|
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
04/13/2021 | BOARD | Approved | |
03/24/2021 | TAC | Recommended for Approval | Revision Request Consideration |
03/11/2021 | PRS | Recommended for Approval | Revision Request Consideration |
02/11/2021 | PRS | Recommended for Approval | Impact Analysis Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
04/13/2021 | BOARD | to approve NPRR1066 as recommended by TAC in the 3/24/21 TAC Report | Passed |
03/24/2021 | TAC | to recommend approval of NPRR1066 as recommended by PRS in the 3/11/21 PRS Report | Passed |
03/11/2021 | PRS | to endorse and forward to TAC the 2/11/21 PRS Report and Impact Analysis for NPRR1066 | Passed |
02/11/2021 | PRS | to recommend approval of NPRR1066 as revised by PRS | Passed |
Background
Status: | Approved |
---|---|
Date Posted: | Jan 27, 2021 |
Sponsor: | ERCOT |
Urgent: | No |
Sections: | 1.6.5 and 7.4 |
Description: | This Nodal Protocol Revision Request (NPRR) grants ERCOT the discretion to apply existing standards that are applicable to older Generation Resources registered with ERCOT (a “grandfathered” standard) to an existing generation unit owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) that is transferring Load into ERCOT and seeks to interconnect the existing generation unit to the ERCOT Transmission Grid in conjunction with the Load transfer. ERCOT will only apply a grandfathered standard if the MOU or EC provides a written explanation as to why it cannot comply with the standard imposed on new Generation Resources, and demonstrates to ERCOT’s satisfaction that allowing the generation unit to comply with the grandfathered standard is reasonable and will not create a risk to reliability of the ERCOT System. This NPRR also clarifies that, should an MOU or EC interconnect an older generation unit to the ERCOT Transmission System as part of a Load integration, the unit will not qualify the MOU or EC to receive Pre-Assigned Congestion Revenue Rights (PCRRs). |
Reason: | Addresses current operational issues |
Key Documents
Jan 27, 2021 - doc - 54 KB
Feb 15, 2021 - xls - 116 KB
Feb 15, 2021 - doc - 92 KB
Mar 16, 2021 - xls - 128.5 KB
Mar 16, 2021 - doc - 94 KB
Mar 29, 2021 - xls - 111.5 KB
Mar 29, 2021 - doc - 96.5 KB
Apr 16, 2021 - doc - 97.5 KB