Title Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs
Next Group
Next Step
Status Approved on 12/16/2021

Action

Date Gov Body Action Taken Next Steps
12/16/2021 PUCT Approved
12/10/2021 BOARD Recommended for Approval Revision Request Consideration
11/29/2021 TAC Recommended for Approval Revision Request Consideration
11/10/2021 PRS Recommended for Approval Revision Request Consideration
10/14/2021 PRS Recommended for Approval Impact Analysis Consideration
06/10/2021 PRS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
12/16/2021 PUCT to approve NPRR1077 and accompanying ERCOT Market Impact Statement as presented in Project No. 52307, Review of Rules Adopted by the Independent Organization in Calendar Year 2021 Passed
12/10/2021 BOARD to recommend approval of NPRR1077 as recommended by TAC in the 11/29/21 TAC Report. Passed
11/29/2021 TAC To recommend approval of NPRR1077 as recommended by PRS in the 11/10/21 PRS Report as amended by the 11/22/21 ERCOT comments. Passed
11/10/2021 PRS To endorse and forward to TAC the 10/14/21 PRS Report and Revised Impact Analysis for NPRR1077 with a recommended priority of 2022 and rank of 3550
10/14/2021 PRS To recommend approval of NPRR1077 as amended by the 8/16/21 ERCOT comments Passed
06/10/2021 PRS To table NPRR1077 and refer the issue to ROS and WMS Passed

Background

Status: Approved
Date Posted: May 19, 2021
Sponsor: ERCOT
Urgent: No
Sections: 2.1, 2.2, 3.8.7, 6.3.2, 6.5.5.2, and 16.11.4.3.2
Description: This Nodal Protocol Revision Request (NPRR) expands the Self-Limiting Facility concept introduced in NPRR1026, BESTF-7 Self-Limiting Facilities, to include sites with one or more Settlement Only Generators (SOGs). This NPRR also introduces a number of additional revisions to fully address requirements for generators and Energy Storage Systems (ESSs) that are connected at distribution voltage. In order to ensure that SOGs in Self-Limiting Facilities abide by established MW Injection and MW Withdrawal limits, and in order to ensure that ERCOT operators and system planners have clear visibility into the performance of SOGs, this NPRR requires the Qualified Scheduling Entity (QSE) for any SOG to provide telemetry of the injection or withdrawal at the Point of Interconnection (POI) (for transmission-connected sites) or Point of Common Coupling (POCC) (for distribution-connected sites) as well as telemetry of gross real power injection and withdrawal at the generator terminals and the status of each SOG’s breaker. Self-Limiting Facilities that include SOGs would be subject to the same consequences as other Self-Limiting Facilities when the MW Injection or MW Withdrawal limit is exceeded.
Reason: Addresses current operational issues; Market efficiencies or enhancements