NPRR1144

Summary

Title Station Service Backup Power Metering
Next Group
Next Step
Status Approved on 03/23/2023
Effective Dates
04/01/2023

Action

Date Gov Body Action Taken Next Steps
03/23/2023 PUCT Approved
02/28/2023 BOARD Recommended for Approval Revision Request Consideration
01/24/2023 TAC Recommended for Approval Revision Request Consideration
12/08/2022 PRS Recommended for Approval Revision Request Consideration
11/11/2022 PRS Recommended for Approval Impact Analysis
08/11/2022 PRS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
03/23/2023 PUCT to approve NPRR1144 and accompanying ERCOT Market Impact Statement as presented in Project No. 54445, Review of Rules Adopted by the Independent Organization Passed
02/28/2023 BOARD to recommend approval of NPRR1144 as recommended by TAC in the 1/24/23 TAC Report Passed
01/24/2023 TAC to recommend approval of NPRR1144 as recommended by PRS in the 12/8/22 PRS Report Passed
12/08/2022 PRS to endorse and forward to TAC the 11/11/22 PRS Report and 11/22/22 Impact Analysis for NPRR1144 Passed
11/11/2022 PRS to recommend approval of NPRR1144 as amended by the 8/29/22 Joint Commenters comments Passed
08/11/2022 PRS to table NPRR1144 and refer the issue to WMS Passed

Background

Status: Approved
Date Posted: Jul 27, 2022
Sponsor: Plus Power
Urgent: No
Sections: 10.3.2.3
Description: This Nodal Protocol Revision Request (NPRR) provides a limited exception to the requirement that all loads included in the netting arrangement for an ERCOT-Polled Settlement (EPS) Metering Facility only be connected to the ERCOT Transmission Grid through the EPS metering point(s) for the Facility. The exception would allow no more than 500kW of auxiliary Load connected to a station service transformer to be connected to a Transmission Service Provider’s (TSP’s) or Distribution Service Provider’s (DSP’s) Facilities through a separately metered point using an open transition load transfer switch listed for emergency use.
Reason: Market efficiencies or enhancements