MIS LOG IN

NPRR151

Summary

Title Clarify Definition of a Generator Output Breaker in the Outage Scheduler
Next Group
Next Step
Status Withdrawn

Action

Date Gov Body Action Taken Next Steps
09/24/2008 PRS Referred
03/19/2009 PRS Deferred/Tabled PRS consideration

Voting Record

Date Gov Body Motion Result
09/24/2008 PRS To refer NPRR151 to TPTF for review of CPS Energy’s and Luminant’s comments. Passed
03/19/2009 PRS To table NPRR151 Passed

Background

Status: Withdrawn
Date Posted: Sep 8, 2008
Sponsor: Anthony Alford w/ CenterPoint Energy
Urgent: No
Sections: 3.10.7.5.1, Continuous Telemetry of the Status of Breakers and Switches
Description: This Nodal Protocol Revision Request (NPRR) clarifies the definition of which "generator output breakers" are exempt in the Outage Scheduler.
Reason: Depending upon the configuration of the substation could result in reliability issues when the breakers that control generating unit output are left open indefinitely, and not reported in Outage Scheduler.

Key Documents

Related Content