NPRR264

Summary

Title Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection
Next Group
Next Step
Status Approved on 06/21/2011
Effective Dates
07/01/2011

Action

Date Gov Body Action Taken Next Steps
06/21/2011 BOARD Approved
05/05/2011 TAC Recommended for Approval ERCOT Board consideration of NPRR264
04/21/2011 PRS Recommended for Approval TAC consideration of NPRR264
03/24/2011 PRS Recommended for Approval PRS Impact Analysis review
02/17/2011 PRS Deferred/Tabled PRS language consideration
01/20/2011 PRS Deferred/Tabled PRS langauge consideration
12/16/2010 PRS Deferred/Tabled PRS language consideration
11/18/2010 PRS Deferred/Tabled PRS language consideration
10/21/2010 PRS Deferred/Tabled PRS language consideration
09/23/2010 PRS Deferred/Tabled PRS language consideration
08/19/2010 PRS Deferred/Tabled PRS language consideration

Voting Record

Date Gov Body Motion Result
06/21/2011 BOARD To approve NPRR264 as recommended by TAC in the 5/5/11 TAC Report. Passed
05/05/2011 TAC To recommend approval of NPRR264 as recommended by PRS in the 4/21/11 PRS Report. Passed
04/21/2011 PRS To endorse and forward the 3/24/11 PRS Report and Impact Analysis for NPRR264 to TAC. Passed
03/24/2011 PRS To recommend approval of NPRR264 as amended by the 1/11/11 ERCOT comments and as revised by PRS. Passed
02/17/2011 PRS To table NPRR264 for one month. Passed
01/20/2011 PRS To table NPRR264 for one month. Passed
12/16/2010 PRS To table NPRR264 for one month. Passed
11/18/2010 PRS To table NPRR264 for one month. Passed
10/21/2010 PRS To table NPRR264 for one month. Passed
09/23/2010 PRS To table NPRR264 and to request that the ERCOT CEO reevaluate whether NPRR264 is needed prior to the Texas Nodal Market Implementation Date. Passed
08/19/2010 PRS To table NPRR264 for one month. Passed

Background

Status: Approved
Date Posted: Aug 12, 2010
Sponsor: WMS
Urgent: No
Sections: 1.6.5, 2.1
Description: This Nodal Protocol Revision Request (NPRR) adds language to specify that for a new Point of Interconnection (POI), Generation Resources must comply with provisions of Other Binding Documents (OBDs), Section 3.15, Voltage Support, and Nodal Operating Guide Section 2.9, Voltage Ride-Through Requirements for Generation Resources, based upon the execution date of the most recent Standard Generation Interconnection Agreement (SGIA). For existing Generation Resources with more than one POI, compliance with these requirements is based on the execution of the SGIA relative to the POI where the Generation Resource is electrically connected. This NPRR also revises the definition of POI to clarify that the POI is determined by the voltage level and substation, rather than the location, of the relevant interconnection.
Reason: Some Nodal Protocol requirements applicable to Generation Resources are based upon the date of execution of the SGIA between the Resource owner and the Transmission Service Provider (TSP). For Resources with more than one POI, the question arises which SGIA date should be used to determine applicability of such requirements to the Resource. The Multiple Interconnections for Generators Task Force (MIGTF) recommended that the date of the original SGIA be binding for this purpose. The MIGTF recommendation was endorsed by the Reliability and Operations Subcommittee (ROS), Wholesale Market Subcommittee (WMS), and Technical Advisory Committee (TAC). This NPRR clarifies which Nodal Protocol and OBD requirements are applicable to an existing Generation Resource’s new or multiple POIs.

Key Documents

Related Content