Summary
Title | Add Voltage Support Requirement for IRRs and Allow SCADA Control of Static VAr Devices if Approved by ERCOT (formerly "Add Voltage Support Requirement for IRRs and Allow Manual Control of Static VAr Devices if Approved by ERCOT") |
---|---|
Next Group | |
Next Step | |
Status | Approved on 02/21/2012 |
Effective Dates |
03/01/2012
|
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
02/21/2012 | BOARD | Approved | |
01/05/2012 | TAC | Recommended for Approval | Board consideration |
12/15/2011 | PRS | Recommended for Approval | TAC consideration |
11/17/2011 | PRS | Recommended for Approval | PRS review the Impact Analysis |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
02/21/2012 | BOARD | To approve NPRR423 as recommended by TAC in the 1/5/12 TAC Report. | Passed |
01/05/2012 | TAC | To recommend approval of NPRR423 as recommended by PRS in the 12/15/11 PRS Report. | Passed |
12/15/2011 | PRS | To endorse and forward the 11/17/11 PRS Report and Impact Analysis for NPRR423 to TAC | Passed |
11/17/2011 | PRS | To recommend approval of NPRR423 as amended by the 11/14/11 Oncor Electric Delivery comments and as revised by PRS | Passed |
Background
Status: | Approved |
---|---|
Date Posted: | Nov 2, 2011 |
Sponsor: | ERCOT |
Urgent: | No |
Sections: | 3.15 |
Description: | This Nodal Protocol Revision Request (NPRR) includes Intermittent Renewable Resources (IRRs) in the voltage requirement and clarifies the reactive requirement to be the same as Wind-powered Generation Resources (WGRs). This NPRR also proposes that switchable static Volt-Ampere reactive (VAr) devices can be Supervisory Control and Data Acquisition (SCADA) controlled if approved by ERCOT. |
Reason: | Similar to WGRs, solar power plants cannot have or have very limited reactive capability at output less than 10%. This NPRR will clarify the Reactive Power requirement for solar power plants. Paragraph (8) of Section 3.15 allows Generation Entities to submit ERCOT-specific proposals to meet the Reactive Power requirements. Depending on the location and size of those proposed static VAr devices, the Transmission Service Provider (TSP) may suggest that those devices are in the manual control mode to avoid undesired ERCOT System impacts, such as voltage swing during the switching of those VAr devices. This NPRR provides a solution for those proposed VAr devices operating in the manual control mode based on the agreement between the Generation Resource and TSP |
Key Documents
Nov 2, 2011 - doc - 74 KB
Dec 19, 2011 - doc - 55 KB
Nov 14, 2011 - doc - 51 KB
Nov 22, 2011 - doc - 79.5 KB
Dec 19, 2011 - doc - 80.5 KB
Jan 5, 2012 - doc - 85 KB
Feb 21, 2012 - doc - 85.5 KB