This NPRR proposes deleting paragraph (3) of Section 6.5.9.5.2, which describes the situation in which ERCOT generators could be ioslated in the event of a Block Load Transfer that transferred ERCOT Load to a Non-ERCOT Control Area, an event that can no longer occur.