NPRR707
Summary
Title | Provision of Transmission System Voltage Telemetry to QSEs |
---|---|
Next Group | |
Next Step | |
Status | Withdrawn |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
06/11/2015 | PRS | Deferred/Tabled | Language Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
06/11/2015 | PRS | To table NPRR707 and refer related issues to ROS. | Passed |
Background
Status: | Withdrawn |
---|---|
Date Posted: | May 22, 2015 |
Sponsor: | Luminant |
Urgent: | No |
Sections: | 3.10.7.5.2 |
Description: | This Nodal Protocol Revision Request (NPRR) requires ERCOT to provide, upon request, transmission system voltage at each Generation Resource Point of Interconnection (POI) to the transmission system through telemetry via Inter-Control Center Communications Protocol (ICCP). This is necessary for the Generation Resource to comply with the latest version of North American Electric Reliability Corportation (NERC) Standard VAR-002-3, Generator Operation for Maintaining Network Voltage Schedules. Paragraph R2, 2.3, requires generation operators to monitor the voltage at the location specified in their voltage schedule. This data is readily available from ERCOT and provision of this data should not violate any of the provisions of Nodal Protocol Section 1.3, Confidentiality. |
Reason: | Regulatory requirements |