To grant NPRR766 Urgent status; to recommend approval of NPRR766 as submitted; and to forward to TAC
Passed
Background
Status:
Approved
Date Posted:
Apr 18, 2016
Sponsor:
ERCOT
Urgent:
Yes
Sections:
6.5.7.5, 6.7.5
Description:
This Nodal Protocol Revision Request (NPRR) aligns the Protocol description of the system-wide discount factor with the proposed operational adjustment to the Reserve Discount Factor (RDF) in the Physical Responsive Capability (PRC) calculation, and aligns the posting for RDFs applicable to both Generation Resources and Load Resources.
Reason:
Administrative / Aligns the aforementioned documents with proposed timeline for and changes to the RDF within the ERCOT Methodologies for Determining Ancillary Service Requirements.