NPRR829

Summary

Title Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL
Next Group
Next Step
Status Approved on 10/17/2017

Action

Date Gov Body Action Taken Next Steps
10/17/2017 BOARD Approved
09/28/2017 TAC Recommended for Approval Revision Request Consideration
08/24/2017 TAC Deferred/Tabled Revision Request Consideration
08/11/2017 PRS Recommended for Approval Revision Request Consideration
07/20/2017 PRS Recommended for Approval Impact Analysis Consideration
06/15/2017 PRS Deferred/Tabled Language Consideration
05/11/2017 PRS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
10/17/2017 BOARD To approve NPRR829 as recommended by TAC in the 9/28/17 TAC Report. Passed
09/28/2017 TAC To recommend approval of NPRR829 as recommended by PRS in the 8/11/17 PRS Report and as revised by TAC; and endorsed the revised Impact Analysis for NPRR829. Passed
08/24/2017 TAC To table NPRR829. Passed
08/11/2017 PRS To endorse and forward to TAC the 7/20/17 PRS Report as amended by the 8/9/17 ERCOT comments and Impact Analysis for NPRR829 with a recommended priority of 2019 and rank of 2510. Passed
07/20/2017 PRS To recommend approval of NPRR829 as amended by the 7/14/17 ERCOT comments and as revised by PRS. Passed
06/15/2017 PRS To table NPRR829 for one month. Passed
05/11/2017 PRS To table NPRR829 and refer the issue to the Credit Work Group (Credit WG) and WMS. Passed

Background

Status: Approved
Date Posted: Apr 26, 2017
Sponsor: Enchanted Rock / Electranet QSE I, LLC
Urgent: No
Sections: 1.3.1.1, 6.3.2, 6.5.5.2, 16.11.4.3.2
Description: This Nodal Protocol Revision Request (NPRR) provides a mechanism for a Qualified Scheduling Entity (QSE) with non-modeled generation to inform ERCOT in a timely manner the net generation to the ERCOT grid from their Non-Modeled Generators so that the output can be considered in the estimate of RTL. Absent this NPRR, output from Non-Modeled Generators is not included in estimating the QSE’s RTL, and the QSE is required to post a superfluous amount of collateral.
Reason: Currently it is difficult for non-modeled generation to hedge in the Day-Ahead Market (DAM) due to potential superfluous collateral calls during high priced Real-Time Market (RTM) events. Using telemetered data from non-modeled generation will allow ERCOT to more accurately calculate QSE collateral requirements. This NPPR will increase DAM liquidity due to increased participation of non-modeled generation in the DAM. Implementing this NPRR has the potential to allow ERCOT to gain near Real-Time transparency into non-modeled generation which could increase their ability in analyzing Real-Time system conditions. Furthermore, ERCOT will better understand the true position of the QSE by Operating Day and will also better understand their cash flow.