- Home
- Market Rules
- Issues
NPRR938
Summary
Title | Distribution Voltage Level Block Load Transfer (BLT) Compensation |
---|---|
Next Group | |
Next Step | |
Status | Withdrawn |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
06/13/2019 | PRS | Deferred/Tabled | Language Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
06/13/2019 | PRS | to table NPRR938 and refer the issue to WMS | Passed |
Background
Status: | Withdrawn |
---|---|
Date Posted: | Apr 26, 2019 |
Sponsor: | Golden Spread Electric Cooperative |
Urgent: | No |
Sections: | 6.6.3.5 |
Description: | This Nodal Protocol Revision Request (NPRR) provides for the compensation of distribution voltage level Block Load Transfers (BLTs) that are instructed to switch from the ERCOT Control Area to a non-ERCOT Control area. |
Reason: | Addresses current operational issues, Regulatory requirements |
Key Documents
Apr 26, 2019 - docx - 61.1 KB
May 20, 2019 - docx - 54.1 KB
Jun 14, 2019 - docx - 62.8 KB
Jul 10, 2019 - docx - 24.9 KB
Jul 22, 2019 - doc - 58 KB
Dec 13, 2019 - doc - 54 KB