MIS LOG IN

OGRR202

Summary

Title Clarification of Responsibility for Switching of Transmission Elements
Next Group
Next Step
Status Approved on 08/02/2007
Effective Dates
09/01/2007

Action

Date Gov Body Action Taken Next Steps
08/02/2007 TAC Approved
07/12/2007 ROS Recommended for Approval
06/29/2007 ROS Recommended for Approval Language and IA Review

Voting Record

Date Gov Body Motion Result
08/02/2007 TAC Approve OGRR202 as revised by TAC. Passed
07/12/2007 ROS Recommend approval of OGRR202 as submitted via email vote. The Consumer Market Segment was not represented in the vote. Passed
06/29/2007 ROS To grant Urgent status Passed

Background

Status: Approved
Date Posted: Jun 27, 2007
Sponsor: ERCOT
Urgent: Yes
Sections: 1.7.3
Description: This Operating Guide Revision Request (OGRR) is proposed to address NERC Standard requirements. NERC Standards require the development, maintenance, and implementation of formal policies and procedures to provide for transmission reliability. Specifically to be included is designation of responsibility for switching transmission elements. The specific requirement is Requirement # R6.3 of NERC Standard TOP-004-0, presently in effect, and the same requirement number in NERC Standard TOP-004-1 to be effective October 1, 2007.
Reason: The ERCOT Protocols and Operating Guides do not have clear, documented indication as to who, if anyone, is responsible for transmission switching duties and how they are coordinated. This revision is proposed to address NERC Standard requirements.

Key Documents

Related Content