- Home
- Market Rules
- Issues
OGRR240
Summary
Title | CREZ Facility Protection and Control Requirements |
---|---|
Next Group | |
Next Step | |
Status | Approved on 06/03/2010 |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
06/03/2010 | TAC | Approved | |
05/13/2010 | ROS | Recommended for Approval | TAC Consideration |
03/11/2010 | ROS | Referred | ROS Consideration |
02/19/2010 | OWG | Referred | ROS Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
06/03/2010 | TAC | To approve of OGRR240 as amended by the 6/2/10 Oncor comments and as revised by TAC | Passed |
05/13/2010 | ROS | To recommend approval of OGRR240 as amended by the 5/7/10 OGRR240/242 Task Force comments and as revised by ROS via roll call vote | Passed |
03/11/2010 | ROS | To refer OGRR240 to the OGRR240/242 Task Force. | Passed |
02/19/2010 | OWG | Consensus to recommend that ROS develop a cross-functional group with members from the System Protection Working Group (SPWG), Dynamics Working Group (DWG), Steady State Working Group (SSWG), Critical Infrastructure Protection Working Group (CIPWG), communications experts, and OWG with a direction to develop a solution for ROS to consider in April |
Background
Status: | Approved |
---|---|
Date Posted: | Feb 15, 2010 |
Sponsor: | American Electric Power Service Corporation (AEPSC) |
Urgent: | Yes |
Sections: | 7.2.2, 7.2.4, 7.2.5.1, 7.2.5.2, 7.2.5.3 |
Description: | This OGRR provides more stringent protection and control requirements for all new CREZ 345 kV Facilities. |
Reason: | This OGRR provides requirements for the protection and control for the CREZ transmission system that supports the transfer of renewable energy reliably from remote areas to large Load centers. This OGRR is aimed at achieving fault clearing within the voltage curve described in North American Electric Reliability Corporation (NERC) Draft Reliability Draft Standard PRC-024-01, Generator During Frequency and Voltage Excursions (http://www.nerc.com/docs/standards/sar/PRC-024-1_Draft1_2009Feb17.pdf). The proposed revisions also address new NERC Planning (http://www.nerc.com/filez/standards/Assess-Transmission-Future-Needs.html) and Protection (http://www.nerc.com/docs/standards/sar/Project2009-07_Tech_Paper_Reliability_of_Protection_Systems_2009Jan20.pdf)standards currently under consideration. Additional information has been provided in the subsequent 021510 AEPSC Comments for this OGRR. |
Key Documents
Feb 15, 2010 - doc - 151 KB
Feb 15, 2010 - doc - 51 KB
Feb 17, 2010 - xls - 121 KB
Feb 23, 2010 - doc - 155.5 KB
Mar 4, 2010 - doc - 39 KB
Mar 4, 2010 - doc - 141.5 KB
Mar 9, 2010 - zip - 17.7 KB
Mar 12, 2010 - doc - 181 KB
May 7, 2010 - doc - 146 KB
May 12, 2010 - doc - 48.5 KB
May 17, 2010 - doc - 187.5 KB
May 17, 2010 - xls - 128.5 KB
May 17, 2010 - xls - 128.5 KB
May 26, 2010 - doc - 146.5 KB
May 26, 2010 - doc - 40 KB
May 26, 2010 - doc - 64.5 KB
May 26, 2010 - doc - 47 KB
Jun 2, 2010 - doc - 147.5 KB
Jun 7, 2010 - doc - 199 KB