This revision allows 1) IDR installations where they are needed or required and provide the most effective utilization of this type of reporting to ERCOT; and 2) Removal of IDR installations that are no longer valid for a premise or ESI ID because of reduced load or consumption based upon 12-month consecutive usage data.