- Home
- Market Rules
- Issues
PRR399
Summary
Title | IDR Replacement with Non-IDR Meter Requirements |
---|---|
Next Group | |
Next Step | |
Status | Withdrawn |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
No updates have been made to this issue. |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
No updates have been made to this issue. |
Background
Status: | Withdrawn |
---|---|
Date Posted: | Apr 15, 2003 |
Sponsor: | Center Point Energy |
Urgent: | Yes |
Sections: | 18.6.1 & 18.6.6 |
Description: | This revision allows 1) IDR installations where they are needed or required and provide the most effective utilization of this type of reporting to ERCOT; and 2) Removal of IDR installations that are no longer valid for a premise or ESI ID because of reduced load or consumption based upon 12-month consecutive usage data. |
Reason: |
Key Documents
Apr 24, 2003 - doc - 57.5 KB
Apr 15, 2003 - doc - 86 KB
Jun 25, 2003 - doc - 71.5 KB
Apr 24, 2003 - doc - 61 KB