This revision would eliminate the compensation currently provided for all Resources called upon for OOME Down and/or Local Balancing Energy Down (generic costs or generic bid limits would still be used as a deployment selection criteria, but not for settlement). Because the language changes desired for this PRR are in the same subsections of Section 6 & 7 as changes currently proposed in PRR485, a request currently in-flight, specific Protocol Section edits are not provided at this time (see Protocols Section 21.4.1(5), providing that suggested language for requested revisions is optional). Once PRR485 is considered by TAC and the BOD, the applicable baseline language will be redlined and submitted as comments to this PRR.