Henry Durrwachter (Luminant Generation Company LLC)
Urgent:
Yes
Sections:
10.3.2.3, Generation Netting for ERCOT Polled Settlement Meters
Description:
This PRR makes a minor change in wording to make clear intent of Protocol Section 10.3.2.3, i.e., that metering may net the generation and the Load associated with such generation for the purposes of settlement.
Reason:
ERCOT has indicated their interpretation of the language in Protocol Section 10.3.2.3 would not allow netting of generation and Loads directly associated with the production of energy at the Sandow generating facility if such additional Load is due to construction of a new generating unit at the existing plant site. Such an interpretation is contrary to the original intent of the Protocols and needs to be clarified.