Summary

Title Meteorological Data Required from QSEs Representing Wind-powered Generation Resources
Next Group
Next Step
Status Approved on 02/17/2009
Effective Dates
04/01/2009

Action

Date Gov Body Action Taken Next Steps
02/17/2009 BOARD Approved
02/05/2009 TAC Recommended for Approval ERCOT Board consideration of PRR794
01/22/2009 PRS Recommended for Approval TAC consideration of PRR794

Voting Record

Date Gov Body Motion Result
02/17/2009 BOARD To approve PRR794 as recommended by TAC. Passed
02/05/2009 TAC To recommend approval of PRR794 as amended by TAC with a proposed effective date of April 1, 2009. Passed
01/22/2009 PRS To recommend approval of PRR794 as amended by Wind Coalition comments and as revised by PRS. Passed

Background

Status: Approved
Date Posted: Dec 24, 2008
Sponsor: QSE Managers Working Group (QMWG)
Urgent: Yes
Sections: 6.5.1.1
Description: This Protocol Revision Request (PRR) will require a Wind-powered Generation Resource (WGR) Entity to provide Real Time meteorological information to ERCOT through its selected Qualified Scheduling Entity (QSE). It will also require ERCOT to establish procedures specifying the accuracy requirements of WGR meteorological information telemetry.
Reason: The site-specific meteorological information is necessary for ERCOT to produce the Short-Term Wind Power Forecast (STWPF) and Total ERCOT Wind Power Forecast (TEWPF) forecasts for WGRs. PRR763, Use of WGRPP as Planned Operating Level in Day-Ahead Resource Plan for WGRs, required the use of the forecasts in the scheduling process. The meteorological information is a requirement of the Nodal Protocols. This requirement needs to be specified in the current zonal Protocols for it to be enforceable.