12.4.4.2.3.3, Public Posting of Entity-Specific Market Reports
Description:
This Protocol Revision Request (PRR) removes the language that requires ERCOT to post the Schedule Control Error (SCE) report seven days after the Operating Day to the Market Information System (MIS).
Reason:
The reason for this PRR is to align the Protocols with current practices. ERCOT has never provided this SCE report to the market. A similar monthly report is produced by the Texas Regional Entity (TRE) and is posted on the TRE website