Peter Wybierala on behalf of NextEra Energy Resources
Urgent:
Yes
Sections:
2.1, 2.2, 6.5.7, 6.5.7.1, 6.5.7.4 (new), 6.7.6
Description:
This PRR clarifies the Reactive Power capability requirement for WGRs by specifying +/- 0.95 power factor criteria as the minimum requirement, and the Generation Resources Unit Reactive Limit (URL) criteria as the maximum requirement contingent upon a System Impact Study by the TSP.