PRR847

Summary

Title Additional Exemptions for Uninstructed Resource Charge
Next Group
Next Step
Status Approved on 08/17/2010

Action

Date Gov Body Action Taken Next Steps
08/17/2010 BOARD Approved
08/05/2010 TAC Recommended for Approval Board consideration
07/20/2010 BOARD Remanded TAC consideration
07/01/2010 TAC Recommended for Approval ERCOT Board consideration
06/17/2010 PRS Recommended for Approval TAC consideration
05/20/2010 PRS Recommended for Approval PRS consider the PRS Recommendation Report and Impact Analysis
04/22/2010 PRS Deferred/Tabled PRS consideration

Voting Record

Date Gov Body Motion Result
08/17/2010 BOARD To approve PRR847 as recommended by TAC in the 8/5/10 TAC Report. Passed
08/05/2010 TAC To recommend approval of PRR847 as recommended by TAC in the 7/1/10 TAC Report. All Market Segments were present for the vote. Passed
07/20/2010 BOARD To remanded PRR847 to TAC. Passed
07/01/2010 TAC To recommend approval of PRR847 as recommended by PRS in the 6/17/10 PRS Report with a proposed effective date of August 1, 2010. Passed
06/17/2010 PRS To endorse and forward the 5/20/10 PRS Report as amended by the 6/7/10 ERCOT comments as revised by PRS and Impact Analysis for PRR847 to TAC. Passed
05/20/2010 PRS To recommend approval of PRR847 as amended by the 5/13/10 Formosa Utility Venture comments. Passed
04/22/2010 PRS To table PRR847 Passed

Background

Status: Approved
Date Posted: Mar 15, 2010
Sponsor: Formosa Utility Venture, Ltd
Urgent: No
Sections: 6.8.1.15.1
Description: This Protocol Revision Request (PPR) proposes two changes to Section 6.8.1.15.1 as follows: 1. When a Qualified Scheduling Entity (QSE) is given a verbal Dispatch Instruction from ERCOT, the QSE shall be exempt from any Uninstructed Resource Charge during the specified verbal Dispatch Instruction time period, provided that the QSE followed instructions to within the Schedule Control Error (SCE) of the verbal Dispatch Instruction given. 2. After a Load acting as a Resource (LaaR) has been activated, the QSE representing the LaaR can request a three hour extension for scheduling under paragraph (11) of Section 6.10.6, Ancillary Service Deployment Performance Conditions, and during this rescheduling time, a Private Use Network shall not incur Uninstructed Resource Charges for three hours as the Load returns back to service. Additional non-substantive administrative revisions, such as correcting defined term usage, number usage and paragraph references, are shown with the author "ERCOT Market Rules."
Reason: The two reasons for the proposed revisions are as follows: 1. Under the current Protocols, QSEs have received Uninstructed Resource Charges when following verbal Dispatch Instructions issued by ERCOT, even though they followed such instructions precisely. 2. Private Use Networks are unfairly penalized with Uninstructed Resource Charges until the Load is restored. The co-generation site is unable to shed generation as there is a consistent Real Time steam demand, therefore the Private Use Network will run an SCE until the Load is restored. Formosa Utility Venture, Ltd. has incurred several Uninstructed Resource Charges after successful deployment of LaaRs in the past.