ERCOT system to recognize an 814_28 notification from the TDSP that a permit is require. If the switch is still pending 20 days later, then use the 814_08 to cancel the move-in. Use the permit not removed notification segment in the 814_08. Track the cancellations for this reason separate from switches that are timed out.
Reason:
To keep all systems in sync due to cancellations. To track the reason for cancellation separately. To allow the CR to know why their pending move-in is being canceled.